In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 20, 2024 - 06:00 AEDT
Scheduled - Humanities 2 and 3 will be undergoing Wi-Fi network upgrades. The estimated time of completion is 17:00 Thursday 21 November. These buildings will go-offline whilst the switches are being updated, there will be service impacts to wired and wireless networks as this upgrade occurs.
Nov 20, 2024 06:00 - Nov 21, 2024 13:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 18, 2024 - 09:45 AEDT
Update - We will be undergoing scheduled maintenance during this time.
Nov 18, 2024 09:45 - Nov 22, 2024 18:15 AEDT
Update - We will be undergoing scheduled maintenance during this time.
Nov 18, 2024 09:45 - Nov 22, 2024 18:15 AEDT
Scheduled - Scheduled maintenance testing of the fire and essential safety measures systems is taking place in the Arts, Library and Student Union Buildings on 18 Nov 24 from 9:45am to 22 Nov 24. Tones may sound during this time.
Nov 18, 2024 09:45 - Nov 22, 2024 18:15 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 18, 2024 - 07:00 AEDT
Scheduled - The linkway joining levels 2 and 3 of Humanities 2 and Humanities 3 buildings will be going structural repairs. The estimated time of completion is Friday 24 January 2025. This project may generate some construction noise during this time.

Please note the roadway will not be accessible from the Sylvia Walton boom gate to the Perebolis East car parks. Parking will not be available in this area during the construction period.

Nov 18, 2024 07:00 - Jan 24, 2025 15:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 18, 2024 - 06:30 AEDT
Scheduled - Full closure of the new carpark at the Matilda’s will occur from 06:30 on Monday 18 November due to maintenance works and wheel stop installation. No access to the carpark unless for an emergency.

Partial closures of this space will take place from 06:30 on Tuesday 19 until 17:00 Friday 22 November. Full access will available with only some carparks being closed.

Nov 18, 2024 06:30 - Nov 22, 2024 16:30 AEDT
Update - We are continuing to work on a fix for this issue.
Nov 08, 2024 - 09:16 AEDT
Identified - Heating and Cooling services in LaTrobe Rural Health School (LRHS) have been interrupted due to unscheduled maintenance works. We aim to have these services back online as soon as possible.
Nov 08, 2024 - 09:15 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 28, 2024 - 08:00 AEDT
Scheduled - Teaching and Learning Spaces TLC-155, PW-215 and PW-217 will be transformed to create an immersive and rich learning experience for La Trobe Students and encourage industry-based learning and collaboration with an expected completion date of Monday 3 March 2025. Construction noise may be heard at times.

Please note works will cease during exam time.

Oct 28, 2024 08:00 - Mar 3, 2025 17:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 28, 2024 - 08:00 AEDT
Scheduled - Teaching and Learning Spaces BUS-130, BUS-228, BUS-229 and BUS-230 will be transformed to create an immersive and rich learning experience for La Trobe Students and encourage industry-based learning and collaboration with an expected completion date of Monday 3 March 2025. Construction noise may be heard at times.

Please note works will cease during exam time.

Oct 28, 2024 08:00 - Mar 3, 2025 17:00 AEDT

About This Site

Infrastructure and Operations Outage notification service.


More information about this service and instructions on how to subscribe are available on the La Trobe University site https://www.latrobe.edu.au/io/impacts-and-outages

Albury Wodonga Campus Buildings Operational
90 days ago
100.0 % uptime
Today
AW1 | David Mann Library Operational
AW-1 | Teaching Building Operational
AW-3 | Teaching Building Operational
AW-3A | Teaching Annexe Operational
AW-4 | Michael J Osborne Building (Administration) Operational
AW-5A | Student Commons Operational
AW-6 | Health Sciences Operational
AW-8 | Nancy F Millis Building (MDFRC) Operational
AW-N | Student Amenities Operational
FS | Field Store Operational
90 days ago
100.0 % uptime
Today
MH1 - McFarlanes Hill Residence 1 Operational
MH2 - McFarlanes Hill Residence 2 Operational
Albury Wodonga Campus Grounds Operational
CTR | Centreway Operational
LD | Lake Drive Operational
UD | University Drive Operational
Bendigo Campus Buildings Under Maintenance
90 days ago
100.0 % uptime
Today
AP1&2 | Administrative Precinct 1&2 Operational
AP3 | Administrative Precinct 3 Operational
AP4 | Administrative Precinct 4 Operational
ARTS | Arts Under Maintenance
AS1 | Applied Science 1 Operational
AS2 | Applied Science 2 Operational
BGB | Infrastructure and Operations Operational
BUS | Business and Technology Operational
CR | Creche Operational
CHR | Change Rooms Operational
CLT | Circular Lecture Theatre Operational
CSC | Computer Centre Operational
CSS | Canoe Shed and Stores Operational
CT | Clinical Teaching Operational
DI | Nancy Long Dining Hall Operational
ED | Education Operational
ET | Engineering and Technology Building Operational
GDP | Graphic Design Operational
HA1 | Hillside Apartments 1 Operational
HA2 | Hillside Apartments 2 Operational
HA3 | Hillside Apartments 3 Operational
HA4 | Hillside Apartments 4 Operational
HA5 | Hillside Apartments 5 Operational
HA6 | Hillside Apartments 6 Operational
HHS1 | Health 1 Operational
HHS2 | LaTrobe Rural Health School (LRHS) Operational
IBC | Ironbark Centre Operational
LSU | Library and Student Union Under Maintenance
MLT | Mckay Lecture Theatre Operational
ORDE | Orde House Operational
R1-A | The Units A Operational
R1-B | The Units B Operational
R2 | The Terraces Operational
R3 - Robert Holmes Village Operational
SSC | Student Services Centre Operational
SC | Sports Centre Operational
VA | Visual Arts Operational
VAC | La Trobe Art Institute Operational
90 days ago
100.0 % uptime
Today
Bendigo Campus Grounds Operational
CTD | Central Drive Operational
P1 | Car Park 1 Operational
P2 | Car Park 2 Operational
P3 | Car Park 3 Operational
P4 | Car Park 4 Operational
P5A | Car Park 5A Operational
P5B | Car Park 5B Operational
P6 | Car Park 6 Operational
P7 | Car Park 7 Operational
P7A | Car Park 7A Operational
P9 | Car Park 9 Operational
P10 | Car Park 10 Operational
P11 | Car Park 11 Operational
P12 | Car Park 12 Operational
P13 | Car Park 13 Operational
P14 | Car Park 14 Operational
P15 | Car Park 15 Operational
P16 | Car Park 16 Operational
P17 | Car Park 17 Operational
P18 | Car Park 18 Operational
P19 | Car Park 19 Operational
P20 | Car Park 20 Operational
P21 | Car Park 21 Operational
P22 | Car Park 22 Operational
P23 | Car Park 23 Operational
P24 | Car Park 24 Operational
P25 | Car Park 25 Operational
P26 | Car Park 26 Operational
P27 | Car Park 27 Operational
P28 | Car Park 28 Operational
SF | Sports Field 1 Operational
City Campus Operational
360 Collins Operational
Melbourne (Bundoora) Campus Buildings Under Maintenance
90 days ago
100.0 % uptime
Today
AGH | Animal Glasshouse Complex Operational
AT | Agora Theatre Operational
AB | Agri Bio Building Operational
AW | Agora West Operational
AE | Agora East Operational
AH1 | Animal House ? Operational
B | Boiler House Operational
BG | Beth Gleeson Building Operational
BS1 | Biological Sciences 1 Operational
BS2 | Biological Sciences 2 Operational
BW | Barnes Way Operational
CC | Chisholm College- All Blocks / Buildings Operational
CCO | Gatehouse Operational
CCR | Childrens Centre Operational
CS1 | Campus Services 1 (I&O) Operational
CS2 | Campus Services 2 Operational
CS2A | Campus Services 2A Operational
CS3 | Landscaping Operational
CSCN | Cycle Smart Centre North Operational
CSCS | Cycle Smart Centre South Operational
DMC | David Myers Building- Centre Operational
DME | David Myers Building- East Operational
DMW | David Myers Building- West Operational
DWB | Donald Whitehead Building Operational
ED1 | Education 1 Operational
ED2 | Education 2 Operational
EH1 | Ernest Jones Hall Operational
EH2 | Ernest Jones Admin Block Operational
ELT | East Lecture Theatres Operational
EMA | The University Lodge- Building A Operational
EMB | Mont Park Building B Operational
EMC | Mont Park Building C Operational
EMD | Mont Park Building D Operational
EME | Mont Park Building E Operational
EP1 | BM La Trobe Guest House Operational
EP1| BM La Trobe House Operational
90 days ago
100.0 % uptime
Today
GC | Glenn College Operational
GS | George Singer Building Operational
HS1 | Health Sciences 1 Operational
HS2 | Health Sciences 2 Operational
HS3 | Health Sciences 3 Operational
HSC | Health Sciences Clinic Operational
HSZ | Hooper & Szental Lecture Theatres Operational
HU2 | Humanities 2 Under Maintenance
HU3 | Humanities 3 Under Maintenance
ISC | Indoor Sports Centre Operational
JG | Jenny Graves Building Operational
JSM | John Scott Meeting House Operational
L | Library Operational
LAN | La Trobe Apartments North Operational
LAS | La Trobe Apartments South Operational
90 days ago
100.0 % uptime
Today
LIMS1 | LaTrobe Institute For Molecular Science 1 Operational
LIMS2 | LaTrobe Institute For Molecular Science 2 Operational
LMC | La Trobe University Medical Centre Operational
LPFP | Lower Playing Field Pavilion Operational
LTSS | La Trobe Sports Stadium Operational
LTWS | Wildlife Sanctuary Operational
MAR | Martin Building Operational
MC | Menzies College Operational
NR1 | Annexe 1- Institute for Advanced Study Operational
NR2 | Confucius Institute Operational
NR3 | La Trobe Apartments Operational
NR4 | La Trobe House Operational
NR6 | Centre for Research on Language Diversity Operational
NR7 | Graduate House - East Operational
NR8 | Michael J Osborne Centre- Administration Operational
OS1 | Outer South Building 1 Operational
OS2 | Sports Hub Operational
OS3 | Melbourne City Football Club Operational
OS4 | Outer South Building 4 Operational
PE | Peribolos East Operational
PS1 | Physical Sciences 1 Operational
PS2 | Physical Sciences 2 Operational
PW | Peribolos West Operational
RD1 | Technology Enterprise Centre Bld- 1 Operational
RD2 | Technology Enterprise Centre Bld- 2 Operational
RD3 | CARM Centre (CAVAL)- R&D Park Operational
RD4 | VABC- R&D Park Operational
RD4A | RD4A Glasshouses Operational
RD4B | RD4B Glasshouses Operational
RD4C | RD4C Operational
RD6 | Walter & Eliza Hall Institute Operational
RLR | R.L.Reid Building Operational
SPP | Sports Park Pavilion Operational
SS | Social Sciences Operational
SW | Sylvia Walton building Operational
SWA | South West Annexe Operational
TER 1 | Terrace 1 Operational
TER 2 | Terrace 2 Operational
TER 3-6 | Terrace 3-6 (EPA) Operational
TER 7 | Terrace 7 Operational
TER 8 | Terrace 8 Operational
TER 9 | Terrace 9 Operational
TER 10 | Terrace 10 Operational
TER 11 | Terrace 11 Operational
TER 12 | Terrace 12 Operational
TER 13 | Terrace 13 Operational
TER 14 | Terrace 14 Operational
TER 15 | EPA Vehicle Testing Station Operational
TLC | The Learning Commons Operational
U | Union Building Operational
UCC | Lifeskills Building Operational
90 days ago
100.0 % uptime
Today
WA | Waterdale Apartments Operational
WLT | West Lecture Theatres Operational
ZA | Zoology Annexe Operational
ZR | Zoology Reserve Operational
Melbourne (Bundoora) Campus Grounds Under Maintenance
90 days ago
100.0 % uptime
Today
ACA | Academic Lawn Operational
ANT | Antenna Site Operational
AR | Agriculture Reserve Operational
CD | College Drive Operational
CG | Community Garden Operational
CP1 | Car Park 1 Operational
CP2 | Car Park 2 Operational
CP2A | Car Park 2A Under Maintenance
CP2B | Car Park 2B Under Maintenance
CP2C | Car Park 2C ? Under Maintenance
CP3 | Car Park 3 Operational
CP4 | Car Park 4 Operational
CP5 | Car Park 5 Operational
CP6 | Car Park 6 Operational
CP7 | Car Park 7 Operational
CP7A | Car Park 7A Operational
CP8 | Car Park 8 Operational
CP9 | Car Park 9 Operational
CP9A | Car Park 9A Operational
CP9B | Car Park 9B Operational
CP9C | Car Park 9C Operational
CP10 | Car Park 10 Operational
CP10A | Car Park 10A Operational
CP11 | Car Park 11 Operational
CP12A | Car Park 12A Operational
CP12B | Car Park 12B Operational
CP12C | Car Park 12C Operational
CP12D | Car Park 12D Operational
CP13A | Car Park 13A Operational
CP13B | Car Park 13B Operational
CP14 | Car Park 14 Operational
CPV | Visitor Car Park Operational
CS1 | Yard Operational
CTR | Centreway Operational
DME | VIP parking bays Operational
90 days ago
100.0 % uptime
Today
DMW | Black parking bays Operational
90 days ago
100.0 % uptime
Today
GD | Glenn Drive Operational
90 days ago
100.0 % uptime
Today
MCD | Menzies Drive ? Operational
90 days ago
100.0 % uptime
Today
MD | Moat Drive Operational
MDR | Main Drive Operational
90 days ago
100.0 % uptime
Today
NE | North Entry Operational
PBI | Plenty Road Bus Interchange Operational
PD | Park Drive Operational
RR | Ring Road Operational
SD | Science Drive Operational
SDI | Science Drive Bus Interchange Operational
90 days ago
100.0 % uptime
Today
SE | South Entry Operational
SIM | Simpson Lawn Operational
TW | Terrace Way Operational
90 days ago
100.0 % uptime
Today
WE | West Entry Operational
Mildura Campus Buildings Operational
29DE | Deakin Avenue Campus Operational
BGR | Brian Grogan Building Operational
MILR1 | Mildura Residence 1 Operational
MILR2 | Mildura Residence 2 Operational
MILR3 | Mildura Residence 3 Operational
MILR4 | Mildura Residence 4 Operational
MOA | Mildura Office Annexe Operational
NEA | North East Annexe Operational
Shepparton Campus Buildings Operational
SHS | Shepparton Campus Building Operational
Projects Operational
Operational
Degraded Performance
Partial Outage
Major Outage
Maintenance
Major outage
Partial outage
No downtime recorded on this day.
No data exists for this day.
had a major outage.
had a partial outage.
Past Incidents
Nov 21, 2024

No incidents reported today.

Nov 20, 2024

Unresolved incident: PROJECT WORKS - HU2, HU3 [BUNDOORA].

Nov 19, 2024
Completed - The scheduled maintenance has been completed.
Nov 19, 15:30 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 18, 08:00 AEDT
Scheduled - The lift in Michael J Osborne Building will be unavailable from 08:00 Monday 18 until 15:30 Tuesday 19 November to allow for scheduled maintenance works. Lift will be put back into service at the end of each day.
Nov 15, 08:28 AEDT
Nov 18, 2024
Completed - The scheduled maintenance has been completed.
Nov 18, 17:15 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 18, 09:46 AEDT
Update - We will be undergoing scheduled maintenance during this time.
Nov 18, 09:44 AEDT
Scheduled - Scheduled maintenance testing of the fire and essential safety measures systems is taking place in Bundoora Campus Wide on 18 Nov 24 from 08:30am - 18 Nov 24 at 4:00pm. Tones may sound during this time.
Nov 18, 09:40 AEDT
Completed - The scheduled maintenance has been completed.
Nov 18, 12:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 18, 11:00 AEDT
Scheduled - Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the McFarlanes Hill Residence 1 and 2 on Monday 18 November between 11:00 and 12:00.

What is System Interface Testing?
I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.

Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems.

Oct 17, 13:49 AEDT
Completed - The scheduled maintenance has been completed.
Nov 18, 11:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 18, 10:30 AEDT
Scheduled - Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the Nancy F Millis Building on Monday 18 November between 10:30 and 11:00.

What is System Interface Testing?
I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.

Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems.

Oct 17, 13:47 AEDT
Completed - The scheduled maintenance has been completed.
Nov 18, 10:30 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 18, 10:00 AEDT
Scheduled - Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the Health Sciences Building on Monday 18 November between 10:00 and 10:30

What is System Interface Testing?
I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.

Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems.

Oct 17, 13:46 AEDT
Completed - The scheduled maintenance has been completed.
Nov 18, 10:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 18, 09:30 AEDT
Scheduled - Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the AW3 Teaching Building on Monday 18 November between 09:30 and 10:00.

What is System Interface Testing?
I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.

Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems.

Oct 17, 13:42 AEDT
Completed - The scheduled maintenance has been completed.
Nov 18, 09:30 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 18, 08:45 AEDT
Scheduled - Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the David Mann Library on Monday 18 November between 08:45 and 09:30.

What is System Interface Testing?
I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.

Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems.

Oct 17, 13:41 AEDT
Completed - The scheduled maintenance has been completed.
Nov 18, 08:45 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 18, 08:00 AEDT
Scheduled - Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the Michael J Osborne Building Administration Building on Monday 18 November between 08:00 and 08:45.

What is System Interface Testing?
I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.

Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems.

Oct 17, 13:40 AEDT
Nov 17, 2024

No incidents reported.

Nov 16, 2024

No incidents reported.

Nov 15, 2024

No incidents reported.

Nov 14, 2024

No incidents reported.

Nov 13, 2024

No incidents reported.

Nov 12, 2024
Completed - The scheduled maintenance has been completed.
Nov 12, 16:30 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 12, 08:00 AEDT
Scheduled - Scheduled maintenance testing of the fire and essential safety measures systems is taking place campus wide on Tuesday 12 November between 08:00 and 16:30. These tests will be conducted without generating noise during exam time.
Nov 11, 15:57 AEDT
Nov 11, 2024

No incidents reported.

Nov 10, 2024

No incidents reported.

Nov 9, 2024

No incidents reported.

Nov 8, 2024
Nov 7, 2024

No incidents reported.