In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 05, 2025 - 20:00 AEDT
Scheduled - The power supply to the Library will be interrupted on Friday 5th December commencing at 8:00pm and finishing at 6:00am on Saturday 6th to allow for scheduled maintenance works.
Dec 5, 202520:00 - Dec 6, 202506:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 05, 2025 - 15:00 AEDT
Update - We will be undergoing scheduled maintenance during this time.
Dec 5, 202515:00 - Dec 6, 202518:00 AEDT
Update - We will be undergoing scheduled maintenance during this time.
Dec 5, 202515:00 - Dec 6, 202518:00 AEDT
Update - We will be undergoing scheduled maintenance during this time.
Dec 5, 202515:00 - Dec 6, 202518:00 AEDT
Scheduled - The power supply to Health Sciences 3 Level 4 eastern Science Drive will be interrupted on Friday 5 Dec 25 from 3:00pm - 6:00pm Saturday 6 Dec 25 to allow for scheduled Project works.
Dec 5, 202515:00 - Dec 6, 202518:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 04, 2025 - 09:00 AEDT
Update - We will be undergoing scheduled maintenance during this time.
Dec 4, 202509:00 - Dec 8, 202516:00 AEDT
Update - We will be undergoing scheduled maintenance during this time.
Dec 4, 202509:00 - Dec 8, 202516:00 AEDT
Update - We will be undergoing scheduled maintenance during this time.
Dec 4, 202509:00 - Dec 8, 202516:00 AEDT
Update - We will be undergoing scheduled maintenance during this time.
Dec 4, 202509:00 - Dec 8, 202516:00 AEDT
Scheduled - Scheduled maintenance testing of the fire and essential safety measures systems is taking place in the Residential Buildings Campuswide on Thursday 4 Dec 25 from 9:00am - 4:00pm Monday 8 Dec 25. Tones may sound during this time.
Dec 4, 202509:00 - Dec 8, 202516:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 18, 2025 - 07:00 AEDT
Scheduled - Donald Whitehead Building, Physical Sciences 1, R.L.Reid Building and The Learning Commons will be undergoing Lift Upgrades starting 7am Tuesday 18th November 2025. The estimated time of completion is 3:00pm Friday 20th February 2026. This project may generate some construction noise during this time.
Nov 18, 202507:00 - Feb 20, 202615:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 17, 2025 - 08:28 AEDT
Scheduled - Amenities across levels 2, 3 and 4 of Humanities 3 will be undergoing refurbishment. The estimated time of completion is Friday 20th March 2026. This project may generate some construction noise during this time.
Nov 17, 202508:28 - Mar 20, 202616:28 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 10, 2025 - 07:00 AEDT
Scheduled - The amenities areas on Level 2, Level 3 and the internal stairwell (all levels) of the Education Building will be undergoing refurbishment. The estimated time of completion is Thursday 12th March 2026. This project may generate some construction noise during this time.
Nov 10, 202507:00 - Mar 12, 202615:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 30, 2025 - 10:00 AEDT
Scheduled - WLT1 and Foyer spaces will be undergoing refurbishment. The estimated time of completion is Friday 19th December 2025. This project may generate some construction noise during this time.
Oct 30, 202510:00 - Dec 19, 202510:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 02, 2025 - 16:09 AEDT
Scheduled -
LaTrobe Institute For Molecular Science 1 will be undergoing Building Fabric Works. The estimated time of completion is Thursday 18 Dec 25. This project may generate some construction noise and external walkway will have limited access.
Dec 02, 2025 - 16:09 AEDT
Scheduled annual testing of the fire and essential safety measures systems is taking place in LSU between 08:00am Monday 8th December until 4:30pm Friday 19th December. Tones may sound during this time. Posted on
Dec 05, 2025 - 16:03 AEDT
Scheduled monthly testing of the fire and essential safety measures systems is taking place in across campus on Tuesday 9th December between 08:30am and 4:30pm. Tones may sound during this time. Posted on
Dec 05, 2025 - 16:05 AEDT
The power supply to the David Mann Library and Teaching Buildings AW3 and AW3A will be interrupted on Monday 15th December between 08:00am and 12:00pm to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested. Posted on
Dec 03, 2025 - 09:49 AEDT
The power supply to the Michael J Osborne Building and Teaching Buildings, Student Commons and Health Sciences will be interrupted on Tuesday 16th December between 08:00am and 12:00pm to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested. Posted on
Dec 03, 2025 - 09:51 AEDT
The power supply to the Nancy F Millis Building and Teaching Buildings, Field Stores and Recycling Shed will be interrupted on Wednesday 17th December between 08:00am and 12:00pm to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested. Posted on
Dec 03, 2025 - 09:53 AEDT
The power supply to the McFarlanes Hill Residences 1 and 2 will be interrupted on Thursday 18th December between 08:00am and 12:00pm to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested. Posted on
Dec 03, 2025 - 09:54 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 05, 2025 - 16:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 05, 2025 - 15:59 AEDT
Scheduled -
The Heating in will be unavailable on Chisholm College- All Blocks / Buildings, East Lecture Theatres, all East Lecture Theatres, all Glenn College buildings, George Singer Building, Health Sciences 1 - 3, Jenny Graves Building, Library, LaTrobe Institute For Molecular Science 1, all Menzies College buildings, Social Sciences, Sylvia Walton building, West Lecture Theatres 1-3 will be unavailable on Monday 22 Dec 25 from 7:00am - 5:00pm Monday 19 Jan 26, due to the Annual campus service shutdown. The annual shutdown is essential to the La Trobe University planned maintenance program and will take place in early January 2026. The shutdown consolidates essential work on the University's critical infrastructure, reduces unexpected outages throughout the year and contributes to the reliability of key University infrastructure.
Dec 05, 2025 - 15:59 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 05, 2025 - 16:09 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 05, 2025 - 16:07 AEDT
Scheduled -
Heating, Cooling and Domestic Hot Water services in Beth Gleeson Building, Education 1 & 2, Humanities 2, Peribolos West, Physical Sciences 1 & 2, R.L.Reid Building will be unavailable on Monday 22 Dec 25 from 7:00am - 5:00pm Monday 19 Jan 26, due to the Annual campus service shutdown. The annual shutdown is essential to the La Trobe University planned maintenance program and will take place in early January 2026. The shutdown consolidates essential work on the University's critical infrastructure, reduces unexpected outages throughout the year and contributes to the reliability of key University infrastructure.
Dec 05, 2025 - 16:06 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 05, 2025 - 15:19 AEDT
Scheduled -
The Heating and Cooling services in Agora East, Donald Whitehead Building, Hooper & Szental Lecture Theatres, Martin Building and Peribolos East will be unavailable on Monday 22 Dec 25 from 7:00am - 5:00pm Monday 19 Jan 26, due to the Annual campus service shutdown. The annual shutdown is essential to the La Trobe University planned maintenance program and will take place in early January 2026. The shutdown consolidates essential work on the University's critical infrastructure, reduces unexpected outages throughout the year and contributes to the reliability of key University infrastructure.
Dec 05, 2025 - 15:19 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 05, 2025 - 15:28 AEDT
Scheduled -
The hot water supply to Agora Theatre, David Myers Building Centre, David Myers Building West, and David Myers Building East will be unavailable on Monday 22 Dec 25 from 7:00am - 5:00pm Monday 19 Jan 26, due to the Annual campus service shutdown. The annual shutdown is essential to the La Trobe University planned maintenance program and will take place in early January 2026. The shutdown consolidates essential work on the University's critical infrastructure, reduces unexpected outages throughout the year and contributes to the reliability of key University infrastructure.
Dec 05, 2025 - 15:27 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 05, 2025 - 15:39 AEDT
Scheduled -
Heating and Domestic hot water services in Agora West, Biological Sciences 1, Biological Sciences 2, Humanities 2, Humanities 3, Indoor Sports Centre, LaTrobe Institute For Molecular Science 2, The Learning Commons and Union Building (Eagle Bar & Moat) will be unavailable on Monday 22 Dec 25 from 7:00am - 5:00pm Monday 19 Jan 26, due to the Annual campus service shutdown. The annual shutdown is essential to the La Trobe University planned maintenance program and will take place in early January 2026. The shutdown consolidates essential work on the University's critical infrastructure, reduces unexpected outages throughout the year and contributes to the reliability of key University infrastructure.
Dec 05, 2025 - 15:38 AEDT
Annual Electrical Shutdown to service electrical distribution boards will take place in PS1, AW, JG, AT (excluding Bachelor of Coffee, Charlie's Kebabs and Caffeine), PS2, TLC, BG, HSZ, LIMS2 on Tuesday 6th January between 8:00am and 4:00pm.
Services impacted will be power, lighting, mechanical and lifts.
The annual shutdown is essential to the La Trobe University planned maintenance program and will take place in early January 2026. The shutdown consolidates essential work on the University's critical infrastructure, reduces unexpected outages throughout the year and contributes to the reliability of key University infrastructure. Posted on
Dec 04, 2025 - 10:41 AEDT
Annual Electrical Shutdown to service electrical distribution boards will take place in Animal House, BS1, BS2, RLR, GS, LIMS1 on Wednesday 7th January between 8:00am and 4:00pm.
Services impacted will be power, lighting, mechanical and lifts.
The annual shutdown is essential to the La Trobe University planned maintenance program and will take place in early January 2026.. The shutdown consolidates essential work on the University's critical infrastructure, reduces unexpected outages throughout the year and contributes to the reliability of key University infrastructure. Posted on
Dec 04, 2025 - 10:50 AEDT
Annual Electrical Shutdown to service electrical distribution boards will take place in LIMS1 on Wednesday 7th January between 8:00am and 12:00pm.
Services impacted will be power, lighting, mechanical and lifts.
The annual shutdown is essential to the La Trobe University planned maintenance program and will take place in early January 2026.. The shutdown consolidates essential work on the University's critical infrastructure, reduces unexpected outages throughout the year and contributes to the reliability of key University infrastructure. Posted on
Dec 04, 2025 - 11:01 AEDT
Annual Electrical Shutdown to service electrical distribution boards will take place in the Boiler House, ISC, CS1, CS2 and CS3 on Wednesday 7th January between 1:00pm and 4:00pm.
Services impacted will be power, lighting, mechanical and lifts.
The annual shutdown is essential to the La Trobe University planned maintenance program and will take place in early January 2026.. The shutdown consolidates essential work on the University's critical infrastructure, reduces unexpected outages throughout the year and contributes to the reliability of key University infrastructure. Posted on
Dec 04, 2025 - 11:03 AEDT
Annual Electrical Shutdown to service electrical distribution boards will take place in SW, DME, DMC, DMW, PE, PW, ED1, ED2, HU2 on Thursday 8th January between 8:00am and 4:00pm.
Services impacted will be power, lighting, mechanical and lifts.
Both PW and PW Data Centres will only have data, ICT and Mechanical impacts.
The annual shutdown is essential to the La Trobe University planned maintenance program and will take place in early January 2026.. The shutdown consolidates essential work on the University's critical infrastructure, reduces unexpected outages throughout the year and contributes to the reliability of key University infrastructure. Posted on
Dec 04, 2025 - 12:26 AEDT
Completed -
The scheduled maintenance has been completed.
Dec 5, 17:15 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 26, 12:15 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 26, 12:12 AEDT
Scheduled -
Air-conditioning services in La Trobe Apartments South have been interrupted due to unscheduled maintenance works and will be running in diminished capacity. Works have commenced; we aim to have these services back online as soon as possible.
Nov 26, 12:12 AEDT
Completed -
The scheduled maintenance has been completed.
Dec 5, 16:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 2, 07:30 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 28, 14:19 AEDT
Scheduled -
There will be construction noise taking place in the courtyard and walkway area between R.L.Reid Building and the LaTrobe Institute for Molecular Science 1 buildings, due to nearby fire service repair. The estimated time of completion is Friday 5 Dec 25.
Nov 28, 14:18 AEDT
Completed -
The scheduled maintenance has been completed.
Dec 5, 16:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 1, 07:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 27, 16:15 AEDT
Scheduled -
Scheduled maintenance testing of the fire and essential safety measures systems is taking place in the Arts, Library and Student Union Buildings from Monday 1 Dec 25 - Friday 5 Dec 25. Tones may sound during this time.
Nov 27, 16:15 AEDT
Completed -
The scheduled maintenance has been completed.
Dec 5, 08:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 5, 06:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 1, 15:24 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 1, 15:23 AEDT
Scheduled -
The power supply to Health Sciences 3 level 4 will be interrupted on Friday 5 Dec 25 from 6:00am - 8:00am to allow for scheduled maintenance works.
Dec 1, 15:23 AEDT
Completed -
The scheduled maintenance has been completed.
Dec 5, 06:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 4, 20:00 AEDT
Scheduled -
The power supply to the Library will be interrupted on Thursday 4th December commencing at 8:00pm and finishing at 6:00am on Friday 5th to allow for scheduled maintenance works.
Dec 3, 17:18 AEDT
Completed -
The scheduled maintenance has been completed.
Dec 4, 08:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 4, 06:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 1, 15:16 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 1, 15:14 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 1, 15:13 AEDT
Scheduled -
The power supply to Health Sciences 3 Level 4 will be interrupted on Thursday 4 Dec 25 from 6:00am - 8:00am to allow for scheduled project works.
Dec 1, 15:12 AEDT
Completed -
The scheduled maintenance has been completed.
Dec 3, 15:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 3, 09:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 18, 15:29 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 18, 15:22 AEDT
Scheduled -
The power supply to Robert Holmes Village will be interrupted on Wednesday 3rd November from 9:00am - 3:00pm to allow for scheduled maintenance works.
Nov 18, 15:21 AEDT
Completed -
The scheduled maintenance has been completed.
Dec 2, 08:01 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 2, 06:00 AEDT
Scheduled -
The power supply to the Library will be interrupted on Tuesday 2nd December between 06:00am and 08:00am to allow for scheduled maintenance works.
Dec 1, 16:58 AEDT
Completed -
The scheduled maintenance has been completed.
Dec 2, 08:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 2, 07:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 1, 14:45 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 1, 14:34 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 1, 14:32 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 1, 14:31 AEDT
Scheduled -
The power supply to Education 1 building will be interrupted on 2 Dec 25 from 7:00am - 8:00am to allow for scheduled maintenance works.
Dec 1, 14:31 AEDT
Completed -
The scheduled maintenance has been completed.
Dec 2, 08:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 2, 06:30 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 28, 13:56 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 28, 13:04 AEDT
Scheduled -
Cooling services in Peribolos West level 1, room 101 will be unavailable on Tuesday 2 Dec 25 from 6:30am - 8:00am to allow for scheduled maintenance works.
Nov 28, 13:04 AEDT
Completed -
The scheduled maintenance has been completed.
Dec 1, 17:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 1, 09:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 27, 10:22 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 27, 10:21 AEDT
Scheduled -
Scheduled maintenance testing of the fire and essential safety measures systems is taking place in Menzies College on Monday 1 Dec 25 from 9:00am - 5:00pm. Tones may sound during this time.
Nov 27, 10:21 AEDT
Completed -
The scheduled maintenance has been completed.
Dec 1, 08:30 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 1, 06:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 26, 13:07 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 26, 13:06 AEDT
Scheduled -
Health Sciences 1 building will be undergoing flooring project works. The estimated time of completion is 1 Dec 25. This project will generate construction noise during this time.
Nov 26, 13:06 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 29, 18:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 28, 15:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 18, 15:58 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 18, 15:58 AEDT
Scheduled -
The power supply to Health Sciences 3 Level 3 will be interrupted on Friday 28 Nov 25 from 3:00pm - 6:00pm Saturday 29 Nov 25 to allow for scheduled Project works.
Nov 18, 15:57 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 29, 06:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 28, 20:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 27, 12:25 AEDT
Scheduled -
The power supply to the Library will be interrupted on Friday 28 Nov 25 from 8:00pm - 6:00am Saturday 29 Nov 25 to allow for scheduled maintenance works.
Nov 27, 12:25 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 28, 17:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 17, 07:00 AEDT
Scheduled -
Heating and Cooling services in LIMS2 will be impacted between 07:00am Monday 17th November until 5:00pm Friday 28th November to allow for scheduled BMS upgrades.
Nov 14, 11:43 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 28, 16:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 28, 07:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 27, 16:10 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 27, 16:09 AEDT
Scheduled -
Scheduled maintenance testing of the fire and essential safety measures systems is taking place in Arts, Library and Student Union on Friday 28 Nov 25 from 7:00am - 4:00pm. Tones may sound during this time.
Nov 27, 16:09 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 28, 08:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 28, 06:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 26, 11:25 AEDT
Scheduled -
The power supply to Health Sciences 3 level 3 building will be interrupted on Friday 28 Nov 25 from 6:00am - 8:00am to allow for scheduled project works.
Nov 26, 11:24 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 28, 06:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 27, 20:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 27, 12:23 AEDT
Scheduled -
The power supply to the Library will be interrupted on Thursday 27 Nov 25 from 8:00pm - 6:00am Friday 28 Nov 25 to allow for scheduled maintenance works.
Nov 27, 12:22 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 27, 16:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 27, 07:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 26, 13:34 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 26, 13:21 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 26, 13:13 AEDT
Scheduled -
Scheduled maintenance testing of the fire and essential safety measures systems is taking place in the Admin Buildings AP1-4, Infrastructure and Operations, Sports Centre on Thursday 27 Nov 25 from 7:00am - 4:00pm. Tones may sound during this time.
Nov 26, 13:13 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 27, 16:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 27, 14:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 26, 13:41 AEDT
Scheduled -
The hot water supply to Chisolm College Block 8 will be interrupted on Thursday 27 Nov 25 from 2:00pm - 4:00pm to allow for scheduled maintenance works.
Nov 27, 02:00 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 27, 07:30 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 27, 06:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 26, 11:23 AEDT
Scheduled -
The power supply to Health Sciences 3 level 3 will be interrupted on Thursday 26 Nov 25 from 6:00am - 7:30am to allow for scheduled project works.
Nov 26, 11:23 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 24, 08:01 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 24, 06:00 AEDT
Scheduled -
The power supply to the Library will be interrupted on Monday 24th November between 06:00am and 08:00am to allow for scheduled HV project works.
Nov 21, 16:25 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 24, 08:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 24, 07:00 AEDT
Scheduled -
The power supply to Humanities 2 will be interrupted on Monday 24th November between 07:00am and 08:00am to allow for scheduled maintenance works.
Nov 21, 14:13 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 22, 18:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 21, 15:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 18, 15:45 AEDT
Scheduled -
The power supply to the Kingsbury Drive west side of Health Sciences 3 Level 2 building will be interrupted on Friday 21 Nov 25 from 3:00pm - 6:00pm Saturday 22 Nov 25 to allow for Project works.
Nov 18, 15:44 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 22, 14:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 22, 13:01 AEDT
Scheduled -
The power supply to Menzies College Dining Hall will be interrupted on Saturday 22nd November from 1:00pm to 2:00pm to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Nov 20, 15:51 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 22, 13:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 22, 12:00 AEDT
Scheduled -
The power supply to Glenn College Admin Building will be interrupted on Saturday 22nd November from 12:00pm to 1:00pm to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Nov 20, 15:52 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 22, 12:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 22, 11:00 AEDT
Scheduled -
The power supply to Chisholm College Tower 3 will be interrupted on Saturday 22nd November from 11:00am to 12:00pm to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Nov 20, 15:54 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 22, 10:30 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 22, 09:30 AEDT
Scheduled -
The power supply to Education 2 level 2 will be interrupted on Saturday 22nd November from 09:30am to 10:30am to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Nov 20, 15:56 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 22, 09:30 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 22, 08:30 AEDT
Scheduled -
The power supply to the Jenny Graves Bus Stop will be interrupted on Saturday 22nd November from 08:30am to 09:30am to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Nov 20, 15:58 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 22, 07:31 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 22, 06:30 AEDT
Scheduled -
The power supply to Agora Theatre Level 1 will be interrupted on Saturday 22nd November from 06:30am to 07:30am to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Nov 20, 15:59 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 22, 07:30 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 22, 06:30 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 20, 16:00 AEDT
Scheduled -
The power supply to Agora West Therapy will be interrupted on Saturday 22 Nov 25 from 7:30am - 8:30am to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Nov 20, 16:00 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 22, 07:30 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 22, 06:30 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 20, 15:58 AEDT
Scheduled -
The power supply to the Library Level 1 will be interrupted on Saturday 22 Nov 25 from 6:30am-7:30am to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Nov 20, 15:58 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 21, 17:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 17, 07:01 AEDT
Scheduled -
The paved courtyard between LIMS1 and RLR will be undergoing fire service valve repairs. The estimated time of completion is Friday 21st November at 5:00pm. This project may generate some construction noise during this time.
Nov 14, 13:37 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 21, 15:30 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 21, 07:30 AEDT
Scheduled -
the LIMS2 Plant Hydraulic Cupboard (located near room 419) will be undergoing planned maintenance works of which may generate noise on Friday 21st November between 7:30am and 4:30pm. The bulk of the construction noise is expected to take place between 7:30am and 08:00am.
Nov 20, 16:45 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 21, 10:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 21, 08:30 AEDT
Scheduled -
Heating and/or Cooling services in RLR will be unavailable on Friday 21st November between 08:30am and 10:00am to allow for scheduled maintenance works.
Nov 20, 09:21 AEDT
Completed -
The scheduled maintenance has been completed.
Nov 21, 08:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 21, 07:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Nov 20, 14:13 AEDT
Scheduled -
The power supply to Animal House 7 will be interrupted on Friday 21 Nov 25 from 7:00am - 8:00am to allow for Residual Current Device (RCD) replacement.
Nov 20, 14:13 AEDT