In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 18, 06:30 AEST
Scheduled - The power supply to Campus Services 1 (I&O), Campus Services 2, Campus Services 2A, Landscaping, Beth Gleeson Building, George Singer Building, Bus Terminal, Gatehouse, East Lecture Theatres, Hooper & Szental Lecture Theatres, Lower Playing Field Pavilion, Annexe 1- Institute for Advanced Study, Confucius Institute and Centre for Research on Language Diversity will be interrupted from 06:30 am to 4:00 pm Friday 18th June to allow for RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Investigating - Air-conditioning/Heating services in Nancy F Millis Building (MDFRC) have been interrupted. The I&O team are working to identify the cause and implement a solution.
Jun 17, 14:22 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
May 17, 07:01 AEST
Scheduled - Access around LaTrobe Institute For Molecular Science 1, LaTrobe Institute For Molecular Science 2, Health Sciences 1 and Health Sciences 2 will be restricted from 07:00 am Monday 17th May to allow for building cladding work preparation. An exclusion zone will be set out between buildings. The estimated date of completion is Monday 31st January 2022.

About This Site

Infrastructure and Operations Outage notification service.


More information about this service and instructions on how to subscribe are available on the La Trobe University site https://www.latrobe.edu.au/io/impacts-and-outages

Albury Wodonga Campus Buildings Operational
90 days ago
100.0 % uptime
Today
AW1 | David Mann Library Operational
AW-1 | Teaching Building Operational
AW-3 | Teaching Building Operational
AW-3A | Teaching Annexe Operational
AW-4 | Michael J Osborne Building (Administration) Operational
AW-5A | Student Commons Operational
AW-6 | Health Sciences Operational
AW-8 | Nancy F Millis Building (MDFRC) Operational
AW-N | Student Amenities Operational
FS | Field Store Operational
90 days ago
100.0 % uptime
Today
MH1 - McFarlanes Hill Residence 1 Operational
MH2 - McFarlanes Hill Residence 2 Operational
Albury Wodonga Campus Grounds Operational
CTR | Centreway Operational
LD | Lake Drive Operational
UD | University Drive Operational
Bendigo Campus Buildings Operational
90 days ago
100.0 % uptime
Today
AP1&2 | Administrative Precinct 1&2 Operational
AP3 | Administrative Precinct 3 Operational
AP4 | Administrative Precinct 4 Operational
ARTS | Arts Operational
AS1 | Applied Science 1 Operational
AS2 | Applied Science 2 Operational
BGB | Infrastructure and Operations Operational
BUS | Business and Technology Operational
CR | Creche Operational
CHR | Change Rooms Operational
CLT | Circular Lecture Theatre Operational
CSC | Computer Centre Operational
CSS | Canoe Shed and Stores Operational
CT | Clinical Teaching Operational
DI | Nancy Long Dining Hall Operational
ED | Education Operational
ET | Engineering and Technology Building Operational
GDP | Graphic Design Operational
HA1 | Hillside Apartments 1 Operational
HA2 | Hillside Apartments 2 Operational
HA3 | Hillside Apartments 3 Operational
HA4 | Hillside Apartments 4 Operational
HA5 | Hillside Apartments 5 Operational
HA6 | Hillside Apartments 6 Operational
HHS1 | Health 1 Operational
HHS2 | LaTrobe Rural Health School (LRHS) Operational
IBC | Ironbark Centre Operational
LSU | Library and Student Union Operational
MLT | Mckay Lecture Theatre Operational
ORDE | Orde House Operational
R1-A | The Units A Operational
R1-B | The Units B Operational
R2 | The Terraces Operational
R3 - Robert Holmes Village Operational
SSC | Student Services Centre Operational
SC | Sports Centre Operational
VA | Visual Arts Operational
VAC | La Trobe Art Institute Operational
90 days ago
100.0 % uptime
Today
Bendigo Campus Grounds Operational
CTD | Central Drive Operational
P1 | Car Park 1 Operational
P2 | Car Park 2 Operational
P3 | Car Park 3 Operational
P4 | Car Park 4 Operational
P5A | Car Park 5A Operational
P5B | Car Park 5B Operational
P6 | Car Park 6 Operational
P7 | Car Park 7 Operational
P7A | Car Park 7A Operational
P9 | Car Park 9 Operational
P10 | Car Park 10 Operational
P11 | Car Park 11 Operational
P12 | Car Park 12 Operational
P13 | Car Park 13 Operational
P14 | Car Park 14 Operational
P15 | Car Park 15 Operational
P16 | Car Park 16 Operational
P17 | Car Park 17 Operational
P18 | Car Park 18 Operational
P19 | Car Park 19 Operational
P20 | Car Park 20 Operational
P21 | Car Park 21 Operational
P22 | Car Park 22 Operational
P23 | Car Park 23 Operational
P24 | Car Park 24 Operational
P25 | Car Park 25 Operational
P26 | Car Park 26 Operational
P27 | Car Park 27 Operational
P28 | Car Park 28 Operational
SF | Sports Field 1 Operational
City Campus Operational
360 Collins Operational
Melbourne (Bundoora) Campus Buildings Under Maintenance
90 days ago
100.0 % uptime
Today
AGH | Animal Glasshouse Complex Operational
AT | Agora Theatre Operational
AB | Agri Bio Building Operational
AW | Agora West Operational
AE | Agora East Operational
AH1 | Animal House ? Operational
B | Boiler House Operational
BG | Beth Gleeson Building Under Maintenance
BS1 | Biological Sciences 1 Operational
BS2 | Biological Sciences 2 Operational
BW | Barnes Way Operational
CC | Chisholm College- All Blocks / Buildings Operational
CCO | Gatehouse Under Maintenance
CCR | Childrens Centre Operational
CS1 | Campus Services 1 (I&O) Under Maintenance
CS2 | Campus Services 2 Under Maintenance
CS2A | Campus Services 2A Under Maintenance
CS3 | Landscaping Under Maintenance
CSCN | Cycle Smart Centre North Operational
CSCS | Cycle Smart Centre South Operational
DMC | David Myers Building- Centre Operational
DME | David Myers Building- East Operational
DMW | David Myers Building- West Operational
DWB | Donald Whitehead Building Operational
ED1 | Education 1 Operational
ED2 | Education 2 Operational
EH1 | Ernest Jones Hall Operational
EH2 | Ernest Jones Admin Block Operational
ELT | East Lecture Theatres Under Maintenance
EMA | The University Lodge- Building A Operational
EMB | Mont Park Building B Operational
EMC | Mont Park Building C Operational
EMD | Mont Park Building D Operational
EME | Mont Park Building E Operational
EP1 | BM La Trobe Guest House Operational
EP1| BM La Trobe House Operational
90 days ago
100.0 % uptime
Today
GC | Glenn College Operational
GS | George Singer Building Under Maintenance
HS1 | Health Sciences 1 Operational
HS2 | Health Sciences 2 Operational
HS3 | Health Sciences 3 Operational
HSC | Health Sciences Clinic Operational
HSZ | Hooper & Szental Lecture Theatres Under Maintenance
HU2 | Humanities 2 Operational
HU3 | Humanities 3 Operational
ISC | Indoor Sports Centre Operational
JSM | John Scott Meeting House Operational
L | Library Operational
LAN | La Trobe Apartments North Operational
LAS | La Trobe Apartments South Operational
90 days ago
100.0 % uptime
Today
LIMS1 | LaTrobe Institute For Molecular Science 1 Operational
LIMS2 | LaTrobe Institute For Molecular Science 2 Under Maintenance
LMC | La Trobe University Medical Centre Operational
LPFP | Lower Playing Field Pavilion Under Maintenance
LTSS | La Trobe Sports Stadium Operational
LTWS | Wildlife Sanctuary Operational
MAR | Martin Building Operational
MC | Menzies College Operational
NR1 | Annexe 1- Institute for Advanced Study Under Maintenance
NR2 | Confucius Institute Under Maintenance
NR3 | La Trobe Apartments Operational
NR4 | La Trobe House Operational
NR6 | Centre for Research on Language Diversity Under Maintenance
NR7 | Graduate House - East Operational
NR8 | Michael J Osborne Centre- Administration Operational
OS1 | Outer South Building 1 Operational
OS2 | Sports Hub Operational
OS3 | Melbourne City Football Club Operational
OS4 | Outer South Building 4 Operational
PE | Peribolos East Operational
PS1 | Physical Sciences 1 Operational
PS2 | Physical Sciences 2 Operational
PW | Peribolos West Operational
RD1 | Technology Enterprise Centre Bld- 1 Operational
RD2 | Technology Enterprise Centre Bld- 2 Operational
RD3 | CARM Centre (CAVAL)- R&D Park Operational
RD4 | VABC- R&D Park Operational
RD4A | RD4A Glasshouses Operational
RD4B | RD4B Glasshouses Operational
RD4C | RD4C Operational
RD6 | Walter & Eliza Hall Institute Operational
RLR | R.L.Reid Building Operational
SPP | Sports Park Pavilion Operational
SS | Social Sciences Operational
SW | Sylvia Walton building Operational
SWA | South West Annexe Operational
TC | Thomas Cherry Building Operational
TER 1 | Terrace 1 Operational
TER 2 | Terrace 2 Operational
TER 3-6 | Terrace 3-6 (EPA) Operational
TER 7 | Terrace 7 Operational
TER 8 | Terrace 8 Operational
TER 9 | Terrace 9 Operational
TER 10 | Terrace 10 Operational
TER 11 | Terrace 11 Operational
TER 12 | Terrace 12 Operational
TER 13 | Terrace 13 Operational
TER 14 | Terrace 14 Operational
TER 15 | EPA Vehicle Testing Station Operational
TLC | The Learning Commons Operational
U | Union Building Operational
UCC | Lifeskills Building Operational
90 days ago
100.0 % uptime
Today
WA | Waterdale Apartments Operational
WLT | West Lecture Theatres Operational
ZA | Zoology Annexe Operational
ZR | Zoology Reserve Operational
Melbourne (Bundoora) Campus Grounds Operational
90 days ago
100.0 % uptime
Today
ACA | Academic Lawn Operational
ANT | Antenna Site Operational
AR | Agriculture Reserve Operational
CD | College Drive Operational
CG | Community Garden Operational
CP1 | Car Park 1 Operational
CP2 | Car Park 2 Operational
CP2A | Car Park 2A Operational
CP2B | Car Park 2B Operational
CP2C | Car Park 2C ? Operational
CP3 | Car Park 3 Operational
CP4 | Car Park 4 Operational
CP5 | Car Park 5 Operational
CP6 | Car Park 6 Operational
CP7 | Car Park 7 Operational
CP7A | Car Park 7A Operational
CP8 | Car Park 8 Operational
CP9 | Car Park 9 Operational
CP9A | Car Park 9A Operational
CP9B | Car Park 9B Operational
CP9C | Car Park 9C Operational
CP10 | Car Park 10 Operational
CP10A | Car Park 10A Operational
CP11 | Car Park 11 Operational
CP12A | Car Park 12A Operational
CP12B | Car Park 12B Operational
CP12C | Car Park 12C Operational
CP12D | Car Park 12D Operational
CP13A | Car Park 13A Operational
CP13B | Car Park 13B Operational
CP14 | Car Park 14 Operational
CPV | Visitor Car Park Operational
CS1 | Yard Operational
CTR | Centreway Operational
GD | Glenn Drive Operational
90 days ago
100.0 % uptime
Today
MCD | Menzies Drive ? Operational
90 days ago
100.0 % uptime
Today
MD | Moat Drive Operational
NE | North Entry Operational
PBI | Plenty Road Bus Interchange Operational
PD | Park Drive Operational
RR | Ring Road Operational
SD | Science Drive Operational
SE | South Entry Operational
SIM | Simpson Lawn Operational
WE | West Entry Operational
TW | Terrace Way Operational
90 days ago
100.0 % uptime
Today
SDI | Science Drive Bus Interchange Operational
90 days ago
100.0 % uptime
Today
MDR | Main Drive Operational
90 days ago
100.0 % uptime
Today
Mildura Campus Buildings Operational
29DE | Deakin Avenue Campus Operational
BGR | Brian Grogan Building Operational
MILR1 | Mildura Residence 1 Operational
MILR2 | Mildura Residence 2 Operational
MILR3 | Mildura Residence 3 Operational
MILR4 | Mildura Residence 4 Operational
MOA | Mildura Office Annexe Operational
NEA | North East Annexe Operational
Shepparton Campus Buildings Operational
SHS | Shepparton Campus Building Operational
Projects Operational
Operational
Degraded Performance
Partial Outage
Major Outage
Maintenance
Major outage
Partial outage
No downtime recorded on this day.
No data exists for this day.
had a major outage.
had a partial outage.
Scheduled Maintenance
POWER OUTAGE - BG [BUNDOORA] Jun 21, 07:00 - Jun 22, 17:00 AEST
The power supply to Beth Gleeson - level 1 will be interrupted from 07:00 am to 5:00 pm Monday 21st June to Tuesday 22nd June to allow for switchboard replacement works
Posted on May 26, 12:29 AEST
The power supply to Wildlife Sanctuary, Outer South Building 1, Sports Hub, Melbourne City Football Club, Outer South Building 4, Sports Park Pavilion, La Trobe Sports Stadium, Lifeskills Building, Zoology Reserve, Agriculture Reserve and Health Sciences Clinic will be interrupted from 07:00 am to 4:00 pm Monday 21st June to allow for RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Posted on Jun 17, 11:00 AEST
POWER OUTAGE - BG [BUNDOORA] Jun 24, 07:00 - Jun 25, 17:00 AEST
The power supply to Beth Gleeson Building - level 2 will be interrupted from 07:00 am to 5:00 pm Thursday 24th June to Friday 25th June to allow for switchboard replacement works.
Posted on May 26, 11:28 AEST
HEATING/COOLING OUTAGE - ED1 [BUNDOORA] Jun 26, 12:43 - Jul 5, 16:43 AEST
Heating/Cooling services in Education 1 will be intermittently unavailable from 11:30 am to 4:15 pm Wednesday 26th May to Friday 6th June to allow for upgrade works.
Posted on May 26, 12:42 AEST
POWER OUTAGE - BG [BUNDOORA] Jun 28, 07:00 - Jun 29, 17:00 AEST
The power supply to Beth Gleeson Building - level 3 will be interrupted from 07:00 am to 5:00 pm Monday 28th June to Tuesday 29th June to allow for switchboard replacement works.
Posted on May 26, 11:30 AEST
The power supply to Barnes Way, Waterdale Apartments, La Trobe Apartments, La Trobe House, The University Lodge- Building A, Mont Park Building B and Mont Park Building C will be interrupted from 09:00 am to 4:00 pm Monday 28th June to allow for RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Posted on Jun 17, 11:04 AEST
The power supply to Glenn College, Menzies College and Chisholm College- All Blocks / Buildings will be interrupted from 09:00 am to 4:00 pm Wednesday 30th June to allow for RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Posted on Jun 17, 11:13 AEST
POWER OUTAGE - BG [BUNDOORA] Jul 1, 07:00 - Jul 2, 17:00 AEST
The power supply to Beth Gleeson - level 4 will be interrupted from 07:00 am to 5:00 pm Thursday 1st July to Friday 2nd July to allow for switchboard replacement works
Posted on May 26, 12:32 AEST
RESTRICTED ACCESS - ET [BENDIGO] Jul 8, 08:00 - Jul 9, 17:00 AEST
Access to the Level 3 Main Entry foyer door will be restricted from 08:00 am Thursday 8th July to 5:00 pm Friday 9th July to allow for scheduled auto door installation.
Posted on Jun 1, 14:29 AEST
Past Incidents
Jun 18, 2021

Unresolved incident: POWER OUTAGE - CS1, CS2, CS2A, CS3, BG, GS, BST, CCO, ELT, HSZ, LPFP, NR1, NR2, NR6 [BUNDOORA].

Jun 17, 2021
Completed - The scheduled maintenance has been completed.
Jun 17, 16:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 17, 10:00 AEST
Scheduled - The water supply to Menzies College Annexes including the Dinning Hall will be interrupted from 10:00 am to 4:00 pm Thursday 17th June to allow for scheduled works as par of the Water main upgrade project.
Jun 16, 16:00 AEST
Resolved - This incident has been resolved.
Jun 17, 12:47 AEST
Investigating - Air-conditioning/Heating services in LaTrobe Rural Health School (LRHS) Building have been interrupted. The I&O team are working to identify the cause and implement a solution.
Jun 9, 08:00 AEST
Resolved - This incident has been resolved.
Jun 17, 12:41 AEST
Investigating - Air-conditioning/Heating services in The Learning Commons Building have been interrupted. The I&O team are working to identify the cause and implement a solution.
Jun 15, 13:43 AEST
Jun 16, 2021
Completed - The scheduled maintenance has been completed.
Jun 16, 17:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 15, 07:02 AEST
Scheduled - The power supply to Humanities 2 - level 5 will be interrupted from 07:00 am to 5:00 pm Tuesday 15th June to Wednesday 16th June to allow for switchboard replacement works.
May 26, 12:24 AEST
Completed - The scheduled maintenance has been completed.
Jun 16, 14:30 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 16, 09:30 AEST
Scheduled - The water supply to Indoor Sports Centre, Campus Services 1-3 (I&O) and Boiler House will be interrupted from 9:30 am to 2:00 pm to allow for water main upgrade works.

Please note if you are on campus on Wednesday 16th June, the nearest Toilets are located at Terraces, John Scott Meeting House & Glenn College Admin.
Jun 15, 09:29 AEST
Completed - The scheduled maintenance has been completed.
Jun 16, 07:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 16, 06:00 AEST
Scheduled - The power supply to Humanities 2 (western end only) will be interrupted from 06:00 am to 07:00 am Friday 16th June to allow for switchboard replacement works.
Jun 3, 11:12 AEST
Jun 15, 2021
Jun 14, 2021

No incidents reported.

Jun 13, 2021
Completed - The scheduled maintenance has been completed.
Jun 13, 08:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 13, 07:01 AEST
Scheduled - The power supply to La Trobe Apartments North and South will be interrupted from 07:00 am to 08:00 am Sunday 13th June to allow for scheduled maintenance works.
Jun 7, 15:20 AEST
Jun 12, 2021
Completed - The scheduled maintenance has been completed.
Jun 12, 16:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 12, 07:30 AEST
Scheduled - The water supply to Childrens Centre will be interrupted from 07:30 am to 4:00 pm Saturday 12th June to allow for scheduled maintenance works.
Jun 9, 08:51 AEST
Completed - The scheduled maintenance has been completed.
Jun 12, 06:15 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 12, 06:00 AEST
Scheduled - The power supply to Library will be interrupted from 06:00 am to 06:15 am Saturday 12th June to allow for installation of a new circuit breaker.
Jun 11, 14:03 AEST
Jun 11, 2021
Completed - The scheduled maintenance has been completed.
Jun 11, 17:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 2, 10:30 AEST
Scheduled - Martin Building level 3 is currently undergoing maintenance schedule upgrades. The estimated date of completion is 5:00 pm Friday 11th May, This project will generate some loud construction noise during this time.
Jun 2, 10:27 AEST
Completed - The scheduled maintenance has been completed.
Jun 11, 17:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 10, 07:00 AEST
Scheduled - The power supply to Humanities 2 - level 4 will be interrupted from 07:00 am to 5:00 pm Thursday 10th June to Friday 11th June to allow for switchboard replacement works.
May 26, 11:56 AEST
Completed - The scheduled maintenance has been completed.
Jun 11, 16:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 11, 07:00 AEST
Scheduled - The power supply to Indoor Sports Centre, Union Building, Campus Services 1 (I&O), Campus Services 2 (not security), Landscaping, Technology Enterprise Centre Bld- 1, Technology Enterprise Centre Bld- 2, Ernest Jones Hall, Ernest Jones Admin Block, Mont Park Building E and Mont Park Building D will be interrupted from 07:00 am to 4:00 pm Friday 11th June to allow for RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jun 10, 09:14 AEST
Completed - The scheduled maintenance has been completed.
Jun 11, 08:30 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 11, 06:31 AEST
Scheduled - The power supply to David Myers Building- West will be interrupted from 06:30 am to 8:30 pm Friday 11th June to allow for switchboard replacement works.
Jun 10, 10:19 AEST
Completed - The scheduled maintenance has been completed.
Jun 11, 07:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 11, 06:00 AEST
Scheduled - The power supply to Humanities 2 (western end only) will be interrupted from 06:00 am to 07:00 am Friday 11th June to allow for switchboard replacement works.
Jun 3, 11:09 AEST
Jun 10, 2021
Completed - The scheduled maintenance has been completed.
Jun 10, 16:03 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 10, 08:33 AEST
Scheduled - The power supply to Education 1, Education 2, Humanities 2, Humanities 3, East Lecture Theatres, Donald Whitehead Building, Social Sciences and Martin Building will be interrupted from 07:00 am to 4:00 pm Thursday 10th June to allow for RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jun 10, 08:32 AEST
Completed - The scheduled maintenance has been completed.
Jun 10, 16:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 10, 07:30 AEST
Scheduled - Infrastructure and Operations will be undertaking scheduled routine maintenance testing of La Trobe Art Institute between 07:30 am and 4:00 pm Thursday 10th June. Tones will be generated during this period.
Jun 9, 08:36 AEST
Completed - The scheduled maintenance has been completed.
Jun 10, 14:30 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 10, 09:30 AEST
Update - Due to the weather conditions yesterday a portion of preparation works for today’s planned water outage has not occurred.
We have had to rescheduled the water outage planned for today until tomorrow Thursday 10th June 9.30am to 2pm.
Jun 9, 09:16 AEST
Scheduled - The water supply to Indoor Sports Centre, Campus Services 1-3 (I&O) and Boiler House will be interrupted from 9:30 am to 2:00 pm to allow for water main upgrade works.

Please note if you are on campus on Wednesday the nearest Toilets are located at Terraces, John Scott Meeting House & Glenn College Admin.
Jun 7, 12:34 AEST
Resolved - This incident has been resolved.
Jun 10, 12:05 AEST
Investigating - Powercor is currently experiencing power loss throughout the Bendigo region, due to storms overnight.
This outage is affecting the Bendigo Campus.
Infrastructure & Operations will continue to update you as we receive information from Powercor
Jun 10, 12:00 AEST
Completed - The scheduled maintenance has been completed.
Jun 10, 08:30 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 10, 07:00 AEST
Scheduled - The hot water supply to Agora Theatre will be interrupted from 07:00 am to 08:30 am Thursday 10th June to allow for scheduled maintenance works.
Jun 9, 08:39 AEST
Jun 9, 2021
Completed - The scheduled maintenance has been completed.
Jun 9, 16:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 9, 07:00 AEST
Scheduled - The power supply to Health Sciences 1-3, West Lecture Theatres, Thomas Cherry and Beth Gleeson Buildings, will be interrupted from 07:00 am to 4:00 pm Wednesday 9th June to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jun 4, 15:01 AEST
Completed - The scheduled maintenance has been completed.
Jun 9, 15:01 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 9, 14:36 AEST
Scheduled - The water supply to LaTrobe Institute For Molecular Science 1 - level 3 will be interrupted from 2:30 pm to 3:00 pm Wednesday 9th June to allow for scheduled maintenance works.
Jun 9, 14:35 AEST
Jun 8, 2021
Completed - The scheduled maintenance has been completed.
Jun 8, 17:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 8, 07:06 AEST
Scheduled - The power supply to Biological Sciences 1 - level 1 rooms 118, 119, 125 & 126 will be interrupted from 07:00 am to 5:00 pm Tuesday 8th June to allow for installation of light switches.
Jun 7, 12:19 AEST
Completed - The scheduled maintenance has been completed.
Jun 8, 17:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 7, 07:00 AEST
Scheduled - The power supply to Humanities 2 - level 3 will be interrupted from 07:00 am to 5:00 pm Monday 7th June to Tuesday 8th June to allow for switchboard replacement works.
May 26, 11:41 AEST
Completed - The scheduled maintenance has been completed.
Jun 8, 14:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 8, 10:02 AEST
Scheduled - The water supply to Menzies College Admin will be interrupted from 10:00 am to 2:00 pm Tuesday 8th June to allow for scheduled maintenance works.
Jun 7, 14:52 AEST
Completed - The scheduled maintenance has been completed.
Jun 8, 07:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 8, 06:00 AEST
Scheduled - The power supply to Humanities 2 (western end only) will be interrupted from 06:00 am to 07:00 am Tuesday 8th June to allow for switchboard replacement works.
Jun 3, 11:05 AEST
Jun 7, 2021
Completed - The scheduled maintenance has been completed.
Jun 7, 16:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 7, 07:00 AEST
Scheduled - The power supply to Sylvia Walton building, David Myers, John Scott Meeting House and South West Annexe buildings will be interrupted from 07:00 am to 4:00 pm Monday 7th June to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jun 4, 14:57 AEST
Completed - The scheduled maintenance has been completed.
Jun 7, 07:45 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 7, 07:00 AEST
Scheduled - The power supply to Sylvia Walton building - level 1 will be interrupted from 07:00 am to 07:45 am Monday 7th June to allow for safety switch replacement works.
Jun 4, 15:26 AEST
Jun 6, 2021
Completed - The scheduled maintenance has been completed.
Jun 6, 17:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 5, 07:00 AEST
Scheduled - Access to LaTrobe Institute For Molecular Science 1 - east and west ends will be restricted from 07:00 am Saturday 5th June to 5:00 pm Sunday 6th June to allow for crane lifts as part of Telstra upgrade works. This project may generate some construction noise during this time.
Jun 2, 16:34 AEST
Jun 5, 2021
Jun 4, 2021
Completed - The scheduled maintenance has been completed.
Jun 4, 17:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 3, 07:00 AEST
Scheduled - The power supply to Humanities 2 - level 2 will be interrupted from 07:00 am to 5:00 pm Thursday 3rd June to Friday 4th June to allow for switchboard replacement works.
May 26, 11:39 AEST
Completed - The scheduled maintenance has been completed.
Jun 4, 16:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
May 6, 07:02 AEST
Update - Beth Gleeson Building Levels 1, 2, 3 & 4
May 5, 15:26 AEST
Scheduled - Access to toilets at Beth Gleeson Building will be restricted from 07:00 am Thursday 6th May to 4:00 pm Friday 4th June to allow for scheduled maintenance works. This project may generate some construction noise during this time.
May 5, 15:26 AEST
Completed - The scheduled maintenance has been completed.
Jun 4, 16:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 29, 08:00 AEDT
Scheduled - The external lift in Agora West will be unavailable from 08:00 am Monday 29th March to 5:00 pm Friday 4th June to allow for scheduled Lift Replacement works.
Mar 26, 09:34 AEDT
Completed - The scheduled maintenance has been completed.
Jun 4, 16:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 29, 08:00 AEDT
Scheduled - The lift in Glenn College - Administration will be unavailable from 08:00 am Monday 29th March to 5:00 pm Friday 4th June to allow for scheduled Lift Replacement works.
Mar 26, 09:25 AEDT
Completed - The scheduled maintenance has been completed.
Jun 4, 16:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 29, 08:00 AEDT
Scheduled - The lift in Terrace 14 will be unavailable from 08:00 am Monday 29th March to 5:00 pm Friday 4th June to allow for scheduled Lift Replacement works.
Mar 26, 09:22 AEDT
Completed - The scheduled maintenance has been completed.
Jun 4, 14:30 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 4, 09:30 AEST
Scheduled - Contractors will be completing a visual audit throughout Health Sciences 1. Audits will take place between 9:30 am and 2:00 pm Friday 4th June.
Jun 4, 09:22 AEST
Completed - The scheduled maintenance has been completed.
Jun 4, 07:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 4, 06:01 AEST
Scheduled - The power supply to Humanities 2 (western end only) will be interrupted from 06:00 am to 07:00 am Friday 4th June to allow for switchboard replacement works.
Jun 3, 09:13 AEST