In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 23, 2025 - 06:00 AEST
Update - We will be undergoing scheduled maintenance during this time.
Jun 23, 2025 06:00 - Aug 1, 2025 16:00 AEST
Scheduled - Menzies College - North Wing will be undergoing a roof replacement. The estimated time of completion is 1st August 2025 at 4:00pm. This project may generate some construction noise during this time.
Jun 23, 2025 06:00 - Aug 1, 2025 16:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 02, 2025 - 09:00 AEST
Scheduled - WLT 2 & WLT 3 will be shut down between Monday 2nd June and Monday 28th July while carpet and chairs are being replaced. There will be increased construction activity coming in and out of the WLT while they remove waste into a bin in CP1 and bring in new materials.
Jun 2, 2025 09:00 - Jul 28, 2025 17:00 AEST
Identified - Air-conditioning services in HA6 have been interrupted due to unscheduled maintenance works. We aim to have these services back online as soon as possible.
Jan 21, 2025 - 16:33 AEDT

About This Site

Infrastructure and Operations Outage notification service.


More information about this service and instructions on how to subscribe are available on the La Trobe University site https://www.latrobe.edu.au/io/impacts-and-outages

Albury Wodonga Campus Buildings Operational
90 days ago
100.0 % uptime
Today
AW1 | David Mann Library Operational
AW-1 | Teaching Building Operational
AW-3 | Teaching Building Operational
AW-3A | Teaching Annexe Operational
AW-4 | Michael J Osborne Building (Administration) Operational
AW-5A | Student Commons Operational
AW-6 | Health Sciences Operational
AW-8 | Nancy F Millis Building (MDFRC) Operational
AW-N | Student Amenities Operational
FS | Field Store Operational
90 days ago
100.0 % uptime
Today
MH1 - McFarlanes Hill Residence 1 Operational
MH2 - McFarlanes Hill Residence 2 Operational
Albury Wodonga Campus Grounds Operational
CTR | Centreway Operational
LD | Lake Drive Operational
UD | University Drive Operational
Bendigo Campus Buildings Operational
90 days ago
100.0 % uptime
Today
AP1&2 | Administrative Precinct 1&2 Operational
AP3 | Administrative Precinct 3 Operational
AP4 | Administrative Precinct 4 Operational
ARTS | Arts Operational
AS1 | Applied Science 1 Operational
AS2 | Applied Science 2 Operational
BGB | Infrastructure and Operations Operational
BUS | Business and Technology Operational
CR | Creche Operational
CHR | Change Rooms Operational
CLT | Circular Lecture Theatre Operational
CSC | Computer Centre Operational
CSS | Canoe Shed and Stores Operational
CT | Clinical Teaching Operational
DI | Nancy Long Dining Hall Operational
ED | Education Operational
ET | Engineering and Technology Building Operational
GDP | Graphic Design Operational
HA1 | Hillside Apartments 1 Operational
HA2 | Hillside Apartments 2 Operational
HA3 | Hillside Apartments 3 Operational
HA4 | Hillside Apartments 4 Operational
HA5 | Hillside Apartments 5 Operational
HA6 | Hillside Apartments 6 Operational
HHS1 | Health 1 Operational
HHS2 | LaTrobe Rural Health School (LRHS) Operational
IBC | Ironbark Centre Operational
LSU | Library and Student Union Operational
MLT | Mckay Lecture Theatre Operational
ORDE | Orde House Operational
R1-A | The Units A Operational
R1-B | The Units B Operational
R2 | The Terraces Operational
R3 - Robert Holmes Village Operational
SSC | Student Services Centre Operational
SC | Sports Centre Operational
VA | Visual Arts Operational
VAC | La Trobe Art Institute Operational
90 days ago
100.0 % uptime
Today
Bendigo Campus Grounds Operational
CTD | Central Drive Operational
P1 | Car Park 1 Operational
P2 | Car Park 2 Operational
P3 | Car Park 3 Operational
P4 | Car Park 4 Operational
P5A | Car Park 5A Operational
P5B | Car Park 5B Operational
P6 | Car Park 6 Operational
P7 | Car Park 7 Operational
P7A | Car Park 7A Operational
P9 | Car Park 9 Operational
P10 | Car Park 10 Operational
P11 | Car Park 11 Operational
P12 | Car Park 12 Operational
P13 | Car Park 13 Operational
P14 | Car Park 14 Operational
P15 | Car Park 15 Operational
P16 | Car Park 16 Operational
P17 | Car Park 17 Operational
P18 | Car Park 18 Operational
P19 | Car Park 19 Operational
P20 | Car Park 20 Operational
P21 | Car Park 21 Operational
P22 | Car Park 22 Operational
P23 | Car Park 23 Operational
P24 | Car Park 24 Operational
P25 | Car Park 25 Operational
P26 | Car Park 26 Operational
P27 | Car Park 27 Operational
P28 | Car Park 28 Operational
SF | Sports Field 1 Operational
City Campus Operational
360 Collins Operational
Melbourne (Bundoora) Campus Buildings Under Maintenance
90 days ago
100.0 % uptime
Today
AGH | Animal Glasshouse Complex Operational
AT | Agora Theatre Operational
AB | Agri Bio Building Operational
AW | Agora West Operational
AE | Agora East Operational
AH1 | Animal House ? Operational
B | Boiler House Operational
BG | Beth Gleeson Building Operational
BS1 | Biological Sciences 1 Operational
BS2 | Biological Sciences 2 Operational
BW | Barnes Way Operational
CC | Chisholm College- All Blocks / Buildings Operational
CCO | Gatehouse Operational
CCR | Childrens Centre Operational
CS1 | Campus Services 1 (I&O) Operational
CS2 | Campus Services 2 Operational
CS2A | Campus Services 2A Operational
CS3 | Landscaping Operational
CSCN | Cycle Smart Centre North Operational
CSCS | Cycle Smart Centre South Operational
DMC | David Myers Building- Centre Operational
DME | David Myers Building- East Operational
DMW | David Myers Building- West Operational
DWB | Donald Whitehead Building Operational
ED1 | Education 1 Operational
ED2 | Education 2 Operational
EH1 | Ernest Jones Hall Operational
EH2 | Ernest Jones Admin Block Operational
ELT | East Lecture Theatres Operational
EMA | The University Lodge- Building A Operational
EMB | Mont Park Building B Operational
EMC | Mont Park Building C Operational
EMD | Mont Park Building D Operational
EME | Mont Park Building E Operational
EP1 | BM La Trobe Guest House Operational
EP1| BM La Trobe House Operational
90 days ago
100.0 % uptime
Today
GC | Glenn College Operational
GS | George Singer Building Operational
HS1 | Health Sciences 1 Operational
HS2 | Health Sciences 2 Operational
HS3 | Health Sciences 3 Operational
HSC | Health Sciences Clinic Operational
HSZ | Hooper & Szental Lecture Theatres Operational
HU2 | Humanities 2 Operational
HU3 | Humanities 3 Operational
ISC | Indoor Sports Centre Operational
JG | Jenny Graves Building Operational
JSM | John Scott Meeting House Operational
L | Library Operational
LAN | La Trobe Apartments North Operational
LAS | La Trobe Apartments South Operational
90 days ago
100.0 % uptime
Today
LIMS1 | LaTrobe Institute For Molecular Science 1 Operational
LIMS2 | LaTrobe Institute For Molecular Science 2 Operational
LMC | La Trobe University Medical Centre Operational
LPFP | Lower Playing Field Pavilion Operational
LTSS | La Trobe Sports Stadium Operational
LTWS | Wildlife Sanctuary Operational
MAR | Martin Building Operational
MC | Menzies College Under Maintenance
NR1 | Annexe 1- Institute for Advanced Study Operational
NR2 | Confucius Institute Operational
NR3 | La Trobe Apartments Operational
NR4 | La Trobe House Operational
NR6 | Centre for Research on Language Diversity Operational
NR7 | Graduate House - East Operational
NR8 | Michael J Osborne Centre- Administration Operational
OS1 | Outer South Building 1 Operational
OS2 | Sports Hub Operational
OS3 | Melbourne City Football Club Operational
OS4 | Outer South Building 4 Operational
PE | Peribolos East Operational
PS1 | Physical Sciences 1 Operational
PS2 | Physical Sciences 2 Operational
PW | Peribolos West Operational
RD1 | Technology Enterprise Centre Bld- 1 Operational
RD2 | Technology Enterprise Centre Bld- 2 Operational
RD3 | CARM Centre (CAVAL)- R&D Park Operational
RD4 | VABC- R&D Park Operational
RD4A | RD4A Glasshouses Operational
RD4B | RD4B Glasshouses Operational
RD4C | RD4C Operational
RD6 | Walter & Eliza Hall Institute Operational
RLR | R.L.Reid Building Operational
SPP | Sports Park Pavilion Operational
SS | Social Sciences Operational
SW | Sylvia Walton building Operational
SWA | South West Annexe Operational
TER 1 | Terrace 1 Operational
TER 2 | Terrace 2 Operational
TER 3-6 | Terrace 3-6 (EPA) Operational
TER 7 | Terrace 7 Operational
TER 8 | Terrace 8 Operational
TER 9 | Terrace 9 Operational
TER 10 | Terrace 10 Operational
TER 11 | Terrace 11 Operational
TER 12 | Terrace 12 Operational
TER 13 | Terrace 13 Operational
TER 14 | Terrace 14 Operational
TER 15 | EPA Vehicle Testing Station Operational
TLC | The Learning Commons Operational
U | Union Building Operational
UCC | Lifeskills Building Operational
90 days ago
100.0 % uptime
Today
WA | Waterdale Apartments Operational
WLT | West Lecture Theatres Under Maintenance
ZA | Zoology Annexe Operational
ZR | Zoology Reserve Operational
Melbourne (Bundoora) Campus Grounds Operational
90 days ago
100.0 % uptime
Today
ACA | Academic Lawn Operational
ANT | Antenna Site Operational
AR | Agriculture Reserve Operational
CD | College Drive Operational
CG | Community Garden Operational
CP1 | Car Park 1 Operational
CP2 | Car Park 2 Operational
CP2A | Car Park 2A Operational
CP2B | Car Park 2B Operational
CP2C | Car Park 2C ? Operational
CP3 | Car Park 3 Operational
CP4 | Car Park 4 Operational
CP5 | Car Park 5 Operational
CP6 | Car Park 6 Operational
CP7 | Car Park 7 Operational
CP7A | Car Park 7A Operational
CP8 | Car Park 8 Operational
CP9 | Car Park 9 Operational
CP9A | Car Park 9A Operational
CP9B | Car Park 9B Operational
CP9C | Car Park 9C Operational
CP10 | Car Park 10 Operational
CP10A | Car Park 10A Operational
CP11 | Car Park 11 Operational
CP12A | Car Park 12A Operational
CP12B | Car Park 12B Operational
CP12C | Car Park 12C Operational
CP12D | Car Park 12D Operational
CP13A | Car Park 13A Operational
CP13B | Car Park 13B Operational
CP14 | Car Park 14 Operational
CPV | Visitor Car Park Operational
CS1 | Yard Operational
CTR | Centreway Operational
DME | VIP parking bays Operational
90 days ago
100.0 % uptime
Today
DMW | Black parking bays Operational
90 days ago
100.0 % uptime
Today
GD | Glenn Drive Operational
90 days ago
100.0 % uptime
Today
MCD | Menzies Drive ? Operational
90 days ago
100.0 % uptime
Today
MD | Moat Drive Operational
MDR | Main Drive Operational
90 days ago
100.0 % uptime
Today
NE | North Entry Operational
PBI | Plenty Road Bus Interchange Operational
PD | Park Drive Operational
RR | Ring Road Operational
SD | Science Drive Operational
SDI | Science Drive Bus Interchange Operational
90 days ago
100.0 % uptime
Today
SE | South Entry Operational
SIM | Simpson Lawn Operational
TW | Terrace Way Operational
90 days ago
100.0 % uptime
Today
WE | West Entry Operational
Mildura Campus Buildings Operational
29DE | Deakin Avenue Campus Operational
BGR | Brian Grogan Building Operational
MILR1 | Mildura Residence 1 Operational
MILR2 | Mildura Residence 2 Operational
MILR3 | Mildura Residence 3 Operational
MILR4 | Mildura Residence 4 Operational
MOA | Mildura Office Annexe Operational
NEA | North East Annexe Operational
Shepparton Campus Buildings Operational
SHS | Shepparton Campus Building Operational
Projects Operational
Operational
Degraded Performance
Partial Outage
Major Outage
Maintenance
Major outage
Partial outage
No downtime recorded on this day.
No data exists for this day.
had a major outage.
had a partial outage.

Scheduled Maintenance

FIRE / ESM SYSTEMS TESTING - L [BUNDOORA] Jul 7, 2025 06:00-09:00 AEST

Scheduled maintenance testing of the fire and essential safety measures systems is taking place in the Library on Monday 7th July from 06:00am to 09:00am.
Please note that heating and cooling to the building will be disrupted. Tones may sound during this time.

Posted on Jun 11, 2025 - 08:40 AEST

FIRE / ESM SYSTEMS TESTING - L [BUNDOORA] Jul 8, 2025 06:00-09:00 AEST

Scheduled maintenance testing of the fire and essential safety measures systems is taking place in the Library on Tuesday 8th July from 06:00am to 09:00am.
Please note that heating and cooling to the building will be disrupted. Tones may sound during this time.

Posted on Jun 11, 2025 - 08:41 AEST

FIRE / ESM SYSTEMS TESTING - L [BUNDOORA] Jul 9, 2025 06:00-09:00 AEST

Scheduled maintenance testing of the fire and essential safety measures systems is taking place in the Library on Wednesday 9th July from 06:00am to 09:00am.
Please note that heating and cooling to the building will be disrupted. Tones may sound during this time.

Posted on Jun 11, 2025 - 08:42 AEST

FIRE / ESM SYSTEMS TESTING - L [BUNDOORA] Jul 10, 2025 06:00-09:00 AEST

Scheduled maintenance testing of the fire and essential safety measures systems is taking place in the Library on Thursday 10th July from 06:00am to 09:00am.
Please note that heating and cooling to the building will be disrupted. Tones may sound during this time.

Posted on Jun 26, 2025 - 13:58 AEST

FIRE / SYSTEMS INTERFACE TESTING - ARTS, LSU [BENDIGO] Jul 14, 2025 08:00-09:30 AEST

Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in Arts and the Library Union Building on Monday 14th of July between 08:00am and 9:30am


What is System Interface Testing?
In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.

Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems.

Posted on Jun 13, 2025 - 10:56 AEST

FIRE / SYSTEMS INTERFACE TESTING - ED [BENDIGO] Jul 14, 2025 09:30-10:00 AEST

Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the Education Building on Monday 14th of July between 09:00am and 10:00am


What is System Interface Testing?
In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.

Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems.

Posted on Jun 13, 2025 - 10:57 AEST

FIRE / SYSTEMS INTERFACE TESTING - IBC [BENDIGO] Jul 14, 2025 10:00-10:30 AEST

Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the Ironbark Centre on Monday 14th of July between 08:00am and 9:30am


What is System Interface Testing?
In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.

Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems.

Posted on Jun 13, 2025 - 10:58 AEST

FIRE / SYSTEMS INTERFACE TESTING - BUS [BENDIGO] Jul 14, 2025 10:30-11:00 AEST

Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the Business and Technology Building on Monday 14th of July between 10:30am and 11:00am.


What is System Interface Testing?
In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.

Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems.

Posted on Jun 13, 2025 - 11:01 AEST

FIRE / SYSTEMS INTERFACE TESTING - VA [BENDIGO] Jul 14, 2025 12:00-12:30 AEST

Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the Visual Arts Building on Monday 14th of July between 12:00pm and 12:30pm.


What is System Interface Testing?
In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.

Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems.

Posted on Jun 13, 2025 - 11:02 AEST

FIRE / SYSTEMS INTERFACE TESTING - DI [BENDIGO] Jul 14, 2025 12:30-13:30 AEST

Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the Nancy Long Dining Hall on Monday 14th of July between 08:00am and 9:30am


What is System Interface Testing?
In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.

Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems.

Posted on Jun 13, 2025 - 11:04 AEST

FIRE / SYSTEMS INTERFACE TESTING - HHS2 [BENDIGO] Jul 14, 2025 13:30-14:30 AEST

Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the Health 2 Building on Monday 14th of July between 1:30pm and 2:30pm.


What is System Interface Testing?
In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.

Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems.

Posted on Jun 13, 2025 - 11:05 AEST

FIRE / SYSTEMS INTERFACE TESTING - AS1, AS2 [BENDIGO] Jul 14, 2025 14:30-15:30 AEST

Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the Applied Sciences 1 and 2 Buildings on Monday 14th of July between 2:30pm and 3:30pm.


What is System Interface Testing?
In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.

Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems.

Posted on Jun 13, 2025 - 11:06 AEST

FIRE / SYSTEMS INTERFACE TESTING - VAC [BENDIGO] Jul 15, 2025 08:00-08:30 AEST

Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the La Trobe Art Institute on Tuesday 15th of July between 08:00am and 9:30am


What is System Interface Testing?
In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.

Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems.

Posted on Jun 13, 2025 - 11:35 AEST

FIRE / SYSTEMS INTERFACE TESTING - ET [BENDIGO] Jul 15, 2025 09:00-10:00 AEST

Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the Arts and the Library Union Building on Tuesday 15th of July between 09:00am and 10:00am


What is System Interface Testing?
In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.

Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems.

Posted on Jun 13, 2025 - 11:36 AEST

FIRE / SYSTEMS INTERFACE TESTING - MLT [BENDIGO] Jul 15, 2025 10:00-10:30 AEST

Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the McKay Lecture Theatre on Tuesday 15th of July between 10:00am 10:30am


What is System Interface Testing?
In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.

Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems.

Posted on Jun 13, 2025 - 11:45 AEST

FIRE / SYSTEMS INTERFACE TESTING - HA1, HA2, HA3, HA4, HA5, HA6 [BENDIGO] Jul 15, 2025 11:00-11:30 AEST

Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in Hillside Apartments 1 - 6 on Tuesday 15th of July between 11:00am and 11:30am.


What is System Interface Testing?
In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.

Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems.

Posted on Jun 13, 2025 - 11:50 AEST

FIRE / SYSTEMS INTERFACE TESTING - R1-A, R1-B [BENDIGO] Jul 15, 2025 11:30-12:00 AEST

Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in The Units on Tuesday 15th of July between 11:30am to 12:00pm


What is System Interface Testing?
In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.

Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems.

Posted on Jun 13, 2025 - 11:52 AEST
Jul 1, 2025
Completed - The scheduled maintenance has been completed.
Jul 1, 08:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jul 1, 06:00 AEST
Scheduled - Scheduled maintenance testing of the fire and essential safety measures systems is taking place in David Myers East, Central and West on Tuesday 1st July between 06:00am and 08:00am. Heating and cooling to these buildings shall be disrupted and tones may sound during this time.
Jun 12, 09:15 AEST
Jun 30, 2025
Completed - The scheduled maintenance has been completed.
Jun 30, 16:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 30, 07:30 AEST
Scheduled - Continuation from works on Thursday 26th June. We will be carrying out repairs on all window awnings in the ARTS building on all levels. This will take place on Monday 30th June between 7:30am and 4:00pm. Works will take up to 1 hour per window.
Jun 27, 15:47 AEST
Jun 29, 2025

No incidents reported.

Jun 28, 2025

No incidents reported.

Jun 27, 2025

No incidents reported.

Jun 26, 2025
Completed - The scheduled maintenance has been completed.
Jun 26, 16:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 26, 07:30 AEST
Scheduled - We will be carrying out repairs on all windows in the ARTS building on all levels. This will take place on Thursday 26 June between 7:30am and 4:00pm. Works will take up to 1 hour per window.
Jun 25, 15:26 AEST
Completed - The scheduled maintenance has been completed.
Jun 26, 15:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 23, 12:00 AEST
Scheduled - The water supply to LIMS1 will be periodically isolated in specific locations from 12:00pm Monday 23rd June until Thursday 26th June at 3:30pm. Outage will only impact 1 toilet block or fixture at a time and will not last more than 20 minutes.
Jun 13, 13:46 AEST
Completed - The scheduled maintenance has been completed.
Jun 26, 12:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 25, 06:00 AEST
Update - We will be undergoing scheduled maintenance during this time.
Jun 19, 11:38 AEST
Scheduled - Access at the end of Glenn Drive and to Glenn Kitchen, will be restricted from 6:00am Wednesday 25th to 12:00pm Thursday 26th June 2025 due to scheduled crane lift works.
Jun 19, 11:36 AEST
Jun 25, 2025
Completed - The scheduled maintenance has been completed.
Jun 25, 15:30 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 23, 07:30 AEST
Update - We will be undergoing scheduled maintenance during this time.
Jun 19, 08:54 AEST
Scheduled - Buildings Education 1 & 2, Sylvia Walton, and Health Sciences 2 will be undergoing building fabric work. The estimated time of completion is Wednesday 25th June 2025 at 3:30pm. This project may generate some construction noise during this time.
Jun 19, 08:54 AEST
Jun 24, 2025

No incidents reported.

Jun 23, 2025
Completed - The scheduled maintenance has been completed.
Jun 23, 16:30 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 23, 08:00 AEST
Update - We will be undergoing scheduled maintenance during this time.
Jun 20, 13:13 AEST
Scheduled - Scheduled maintenance testing of the fire and essential safety measures systems is taking place in the Bendigo Campus Sitewide on Monday 23rd June from 8:00am - 4:30pm. Tones may sound during this time.
Jun 20, 13:13 AEST
Completed - The scheduled maintenance has been completed.
Jun 23, 15:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 19, 08:00 AEST
Scheduled - The water supply to LIMS2 will be periodically isolated in specific locations from 08:00am Thursday 19th June until Monday 23rd June at 3:30pm. Outage will only impact 1 toilet block or fixture at a time and will not last more than 20 minutes.
Jun 13, 13:42 AEST
Completed - The scheduled maintenance has been completed.
Jun 23, 08:01 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 23, 07:00 AEST
Update - We will be undergoing scheduled maintenance during this time.
Jun 20, 11:47 AEST
Scheduled - The power supply to building Education 2, Muslim Prayer room will be interrupted on Monday 23rd June 2025 from 7:00am - 8:00am to allow for scheduled maintenance works.
Jun 20, 11:47 AEST
Jun 22, 2025

No incidents reported.

Jun 21, 2025

No incidents reported.

Jun 20, 2025
Completed - The scheduled maintenance has been completed.
Jun 20, 12:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 20, 09:00 AEST
Update - We will be undergoing scheduled maintenance during this time.
Jun 17, 14:35 AEST
Scheduled - The hot/cold water supply to the male pool shower in the Indoor Sports Centre will be interrupted on Friday 20th June 2025 from 9:00am - 12:00pm to allow for repair works.
Jun 17, 14:35 AEST
Jun 19, 2025
Completed - The scheduled maintenance has been completed.
Jun 19, 12:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 17, 14:00 AEST
Update - We will be undergoing scheduled maintenance during this time.
Jun 13, 13:27 AEST
Scheduled - The water supply to R.L.Reid Building will be periodically isolated in specific locations on Tuesday 17 Jun 25 from 2:00pm - 12:00pm on Thursday 19 Jun 25 to allow for scheduled maintenance works.
Jun 13, 13:26 AEST
Completed - The scheduled maintenance has been completed.
Jun 19, 08:01 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 19, 07:00 AEST
Update - We will be undergoing scheduled maintenance during this time.
Jun 18, 12:18 AEST
Scheduled - The power supply to Health Sciences 3 Level 5 will be interrupted on Thursday 19th June 2025 from 7:00am - 8:00am to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Jun 18, 12:18 AEST
Completed - The scheduled maintenance has been completed.
Jun 19, 08:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 19, 06:30 AEST
Update - We will be undergoing scheduled maintenance during this time.
Jun 18, 12:14 AEST
Scheduled - The power supply to Health Sciences 1 Level 4 will be interrupted on Thursday 19th June 2025 from 6:30am - 8:00am to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Jun 18, 12:13 AEST
Jun 18, 2025

No incidents reported.

Jun 17, 2025
Completed - The scheduled maintenance has been completed.
Jun 17, 17:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 17, 07:30 AEST
Scheduled - The water supply to MCA-1 will be interrupted on Tuesday 17th June between 7:30am and 5:00pm to allow for scheduled maintenance works.
Jun 16, 14:09 AEST
Completed - The scheduled maintenance has been completed.
Jun 17, 15:30 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 16, 12:00 AEST
Update - We will be undergoing scheduled maintenance during this time.
Jun 13, 12:47 AEST
Update - We will be undergoing scheduled maintenance during this time.
Jun 13, 12:33 AEST
Update - We will be undergoing scheduled maintenance during this time.
Jun 13, 12:32 AEST
Scheduled - The water supply to the Sports Park Pavilion will be periodically isolated in specific locations from 12:00pm Monday 16th June until 3:30pm Tuesday 17th June.
Jun 13, 12:31 AEST
Completed - The scheduled maintenance has been completed.
Jun 17, 08:01 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 17, 07:00 AEST
Scheduled - The power supply to HS3 level 5 will be interrupted on Tuesday 17th June between 7:00am and 8:00am to allow for installation of new RCD's in switchboards.
Jun 16, 08:22 AEST
Completed - The scheduled maintenance has been completed.
Jun 17, 08:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 17, 06:30 AEST
Update - We will be undergoing scheduled maintenance during this time.
Jun 16, 08:23 AEST
Scheduled - The power supply to HS1 level 4 will be interrupted on Tuesday 17th June between 6:30am and 8:30am to allow for installation of new RCD's in switchboards.
Jun 16, 08:20 AEST