In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 14, 2026 - 07:00 AEDT
Scheduled - The power supply to L will be interrupted on SATURDAY 14 FEBRUARY from 07:00AM to 3:00PM to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Feb 14, 202607:00-15:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 17, 2025 - 08:28 AEDT
Scheduled - Amenities across levels 2, 3 and 4 of Humanities 3 will be undergoing refurbishment. The estimated time of completion is Wednesday 15th April 2026. This project may generate some construction noise during this time.
Nov 17, 202508:28 - Apr 15, 202615:28 AEST
Identified - Air-conditioning services in Health Science 2, Meeting room 440 and offices 441, 443, 444, 445, 446 and 447 have been interrupted due to unscheduled maintenance works. We aim to have these services back online as soon as possible.
Jan 27, 2026 - 13:25 AEDT
Update - We are continuing to work on a fix for this issue.
Jan 28, 2026 - 14:11 AEDT
Identified - Air-conditioning services in Menzies College Dining Hall level 2 Rooms 201, 201a & 202 have been interrupted due to unscheduled maintenance works. We aim to have these services back online as soon as possible.
Jan 28, 2026 - 14:11 AEDT
Identified - Air-conditioning services in ED have been interrupted due to unscheduled maintenance works. We aim to have these services back online by 3:30pm Wednesday 28 January.
Jan 27, 2026 - 10:04 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 18, 2025 - 07:00 AEDT
Scheduled - Donald Whitehead Building, Physical Sciences 1, R.L.Reid Building and The Learning Commons will be undergoing Lift Upgrades starting 7am Tuesday 18th November 2025. The estimated time of completion is 3:00pm Friday 20th February 2026. This project may generate some construction noise during this time.
Nov 18, 202507:00 - Feb 20, 202615:00 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 10, 2025 - 07:00 AEDT
Scheduled - The amenities areas on Level 2, Level 3 and the internal stairwell (all levels) of the Education Building will be undergoing refurbishment. The estimated time of completion is Thursday 12th March 2026. This project may generate some construction noise during this time.
Nov 10, 202507:00 - Mar 12, 202615:00 AEDT
The power supply to TER 14, JG (level 3) will be interrupted on MONDAY 16 FEBRUARY from 06:00AM to 7:30AM to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested. Posted on
Feb 10, 2026 - 12:19 AEDT
The power supply to JG (levels 1, 2 and 4) will be interrupted on MONDAY 16 FEBRUARY from 7:30AM to 3:00PM to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested. Posted on
Feb 10, 2026 - 12:20 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Feb 13, 2026 - 11:17 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Feb 13, 2026 - 10:46 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Feb 13, 2026 - 10:31 AEDT
Scheduled -
The power supply to Social Sciences Level 1 will be interrupted on Tuesday 17 Feb 26 from 6am - 7am to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Feb 13, 2026 - 10:31 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Feb 13, 2026 - 11:39 AEDT
Scheduled -
The power supply to Social Sciences Level 2 will be interrupted on 17 Feb 26 from 7:00am - 8:00am to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Feb 13, 2026 - 11:39 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Feb 13, 2026 - 11:42 AEDT
Scheduled -
The power supply to Social Sciences Level 3 will be interrupted on Tuesday 17 Feb 26 from 8:00am - 9:00am to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Feb 13, 2026 - 11:42 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Feb 13, 2026 - 11:46 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Feb 13, 2026 - 11:45 AEDT
Scheduled -
The power supply to Social Sciences will be interrupted on Tuesday 17 Feb 26 from 9:00am - 10:00am to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Feb 13, 2026 - 11:44 AEDT
The water supply to all levels of MC-NW will be interrupted on WEDNESDAY 18 FEBRUARY from 09:00AM to 1:00PM to allow for scheduled maintenance works. Posted on
Feb 13, 2026 - 09:36 AEDT
Past Incidents
Feb 14, 2026
Unresolved incident: POWER OUTAGE / SAFETY SWITCH TESTING - L [BUNDOORA].
Completed -
The scheduled maintenance has been completed.
Feb 13, 15:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 13, 07:00 AEDT
Scheduled -
The power supply to PE (excluding data centre), PW (excluding data centre), PS2 (excluding level 1), PS2 will be interrupted on FRIDAY 13 FEBRUARY from 07:00AM to 3:00PM to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Feb 10, 12:13 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 12, 15:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 12, 08:00 AEDT
Scheduled -
The power supply to CCO, TERRACES 7 - 13 will be interrupted on THURSDAY 12 FEBRUARY from 08:00AM to 3:00PM to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Feb 10, 12:11 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 12, 14:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 12, 13:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Feb 11, 15:40 AEDT
Scheduled -
The cold water supply to Glen College Levels 1, 2 & 3 will be interrupted on Thursday 12 Feb 26 from 3:00pm - 4:00pm to allow for scheduled maintenance works.
Feb 11, 15:40 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 12, 08:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 12, 06:00 AEDT
Scheduled -
The power supply to BS1 (level 1), BS2 will be interrupted on THURSDAY 12 FEBRUARY from 06:00AM to 08:00AM to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Feb 10, 12:09 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 11, 16:15 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 6, 16:15 AEDT
Scheduled -
A failure to the cooling within AW1, 3 & 4 occurred on Friday 6 February. This is being investigated. There will be very minimal cooling on Monday 9 and Tuesday 10 February. Cooling should return to half capacity, as it is now due to a breakage, on Wednesday 11 February. Full cooling to be reinstated the week commencing Monday 16 February.
Feb 6, 16:14 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 11, 14:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 11, 09:00 AEDT
Scheduled -
The power supply to AE, HSZ, AG will be interrupted on WEDNESDAY 11 FEBRUARY from 09:00AM to 2:00PM to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Feb 9, 17:12 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 11, 09:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 11, 06:00 AEDT
Scheduled -
The power supply to AW, AT will be interrupted on WEDNESDAY 11 FEBRUARY from 06:00AM to 09:00AM to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Feb 9, 17:10 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 10, 15:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 10, 08:00 AEDT
Scheduled -
The power supply to MT, NR1 ,NR2 , NR 6,NR 8 , SS, Z will be interrupted on TUESDAY 10 FEBRUARY from 08:00AM to 3:00PM to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Feb 3, 10:59 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 10, 09:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 10, 08:00 AEDT
Scheduled -
The power supply to LTWS will be interrupted on TUESDAY 10 FEBRUARY from 08:00AM to 09:00AM to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Feb 3, 10:56 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 10, 08:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 10, 07:00 AEDT
Scheduled -
The power supply to ISC (OFFICES) and JSM will be interrupted on WEDNESDAY 10 FEBRUARY between 07:00AM and 08:00AM to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Feb 3, 10:36 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 10, 07:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 10, 06:00 AEDT
Scheduled -
The power supply to ISC POOL/GYM will be interrupted on WEDNESDAY 10 FEBRUARY between 06:00AM and 07:00AM to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Feb 3, 10:31 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 9, 15:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 9, 07:00 AEDT
Scheduled -
The power supply to Donald Whitehead and Martin Building will be interrupted on MONDAY 9 FEBRUARY between 7:00AM and 3:00PM to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Feb 3, 10:28 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 9, 11:40 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 9, 10:50 AEDT
Scheduled -
We will be undergoing scheduled maintenance during this time.
Feb 9, 10:50 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 9, 10:42 AEDT
Scheduled -
We will be undergoing scheduled maintenance during this time.
Feb 9, 10:41 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 9, 10:40 AEDT
Scheduled -
Physical Sciences 2 level 2 will be undergoing Balustrade project works. The estimated time of completion is 12 Feb 25. This project may generate some construction noise and access during this time.
Feb 9, 10:39 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 9, 09:30 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 9, 08:15 AEDT
Scheduled -
The water supply to AW will be interrupted on MONDAY 9 FEBRUARY from 8:15AM to 9:30AM to allow for scheduled maintenance works.
Feb 6, 08:39 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 7, 15:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 7, 07:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 27, 15:18 AEDT
Scheduled -
The power supply to Health Sciences 1, 2 & 3 will be interrupted on Saturday 7 Feb 26 from 7:00am - 3:00pm to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Jan 27, 15:18 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 7, 08:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 7, 07:30 AEDT
Scheduled -
The power supply to DMW will be interrupted on SATURDAY 7 FEBRUARY from 07:300AM to 08:00AM to allow for scheduled maintenance works.
Feb 6, 11:16 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 6, 17:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 6, 07:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Feb 2, 12:54 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Feb 2, 12:52 AEDT
Scheduled -
Scheduled maintenance testing of the fire and essential safety measures systems is taking place in the Hillside Apartments 1-6 on Friday 6 Feb 26 from 7:00am - 5:00pm. Tones may sound during this time.
Feb 2, 12:52 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 6, 15:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 6, 07:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 27, 14:48 AEDT
Scheduled -
The power supply to Ernest Jones Hall, The University Lodge- Building A, Mont Park Building B, Mont Park Building C and Mont Park Building D will be interrupted on Friday 6 Feb 26 from 7:00am - 3:00pm to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Jan 27, 14:48 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 6, 10:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 6, 09:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 27, 15:06 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 27, 14:56 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 27, 14:54 AEDT
Scheduled -
The power supply to Ernest Jones Hall will be interrupted on Friday 6 Feb 26 from 9:00am - 10:00am to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Jan 27, 14:54 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 6, 09:30 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 6, 08:30 AEDT
Scheduled -
The water supply to AW will be interrupted on FRIDAY 6 FEBRUARY from 08:30AM to 09:30AM to allow for scheduled maintenance works.
Feb 5, 08:44 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 6, 09:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 6, 07:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 27, 15:09 AEDT
Scheduled -
The power supply to Mont Park Building E will be interrupted on Friday 6 Feb 26 from 7:00am - 9:00am to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Jan 27, 15:09 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 6, 08:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 6, 07:00 AEDT
Scheduled -
The power supply to HS2 will be interrupted on FRIDAY 6 FEBRUARY between 07:00AM and08:00AM to allow for scheduled maintenance works.
Feb 5, 08:19 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 5, 17:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 2, 08:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 30, 15:12 AEDT
Scheduled -
The Library and Student Union building on level 3 - South End staff offices, will be undergoing plumbing works. The estimated date of completion is Thursday 5 Feb 26. The plumbing works will generate some noise; staff may wish to avoid working in this area during this time.
Jan 30, 15:12 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 5, 16:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 5, 08:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 30, 12:27 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 30, 12:26 AEDT
Scheduled -
Scheduled maintenance testing of the fire and essential safety measures systems is taking place Campus wide on Thursday 5 Feb 26 from 8:00am - 4:00pm. Tones may sound during this time.
Jan 30, 12:26 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 5, 15:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 5, 09:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 27, 14:36 AEDT
Scheduled -
The power supply to Union building will be interrupted on Thursday 5 Feb 26 from 9:00am - 3:00pm to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Jan 27, 14:36 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 5, 12:30 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 5, 12:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 27, 14:39 AEDT
Scheduled -
The power supply to the Lifeskills Building will be interrupted on Thursday 5 Feb 26 from12:00pm - 12:30pm to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Jan 27, 14:39 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 5, 12:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 5, 09:01 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 27, 14:43 AEDT
Scheduled -
The power supply to Western Lecture Theatre will be interrupted on Thursday 5 Feb 26 from 9:00am - 12:00pm to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Jan 27, 14:43 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 5, 09:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 5, 06:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 27, 14:34 AEDT
Scheduled -
The power supply to the George Singer building will be interrupted on Thursday 5 Feb 26 from 6:00am - 9:00am to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Jan 27, 14:34 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 4, 15:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 4, 10:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 27, 14:26 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 27, 13:32 AEDT
Scheduled -
The power supply to The Learning Commons building will be interrupted on Wednesday 4 Feb 26 from 10:00am - 3:00pm to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Jan 27, 13:32 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 4, 10:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 4, 07:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 27, 13:30 AEDT
Scheduled -
The power supply to R.L.Reid Building will be interrupted on Wednesday 4 Feb 26 from 7:00am - 10:00am to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Jan 27, 13:30 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 3, 15:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 3, 11:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 27, 13:27 AEDT
Scheduled -
The power supply to Education 2 and Humanities 3 buildings will be interrupted on Tuesday 3 Feb 26 from 11:00am - 3:00pm to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Jan 27, 13:27 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 3, 11:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 3, 07:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 27, 13:24 AEDT
Scheduled -
The power supply to Education 1 and Humanities 2 buildings will be interrupted on Tuesday 3 Feb 26 from 7:00am - 11:00am to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Jan 27, 13:24 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 3, 08:30 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 3, 07:30 AEDT
Scheduled -
The power supply to LIMS1 (LEVEL 7 PLANT ROOM) will be interrupted on TUESDAY 3 FEBURARY from 7:30AM to 8:30AM to allow for scheduled maintenance works.
Feb 2, 10:44 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 3, 08:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 3, 07:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Feb 2, 11:45 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Feb 2, 11:44 AEDT
Scheduled -
The power supply to Glenn College South Wing Levels 1,2,3 will be interrupted on Tuesday 3 Feb 26 from 7:00am - 8:00am to allow for Residual Current Device (RCD) changeover.
Feb 2, 11:44 AEDT
Completed -
The scheduled maintenance has been completed.
Feb 2, 15:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 2, 07:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 27, 13:21 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 27, 13:20 AEDT
Scheduled -
The power supply to Beth Gleeson and Sylvia Walton will be interrupted on Monday 2 Feb 2026 from 7:00am to 3:00pm to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Jan 27, 13:20 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 31, 08:30 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 31, 08:00 AEDT
Scheduled -
The power supply to Peribolos West room 121 will be interrupted on Saturday 31st January from 08:00am until 08:30am to allow for scheduled maintenance works.
Jan 30, 11:58 AEDT