Scheduled - Menzies College - North Wing will be undergoing a roof replacement. The estimated time of completion is 1st August 2025 at 4:00pm. This project may generate some construction noise during this time.
Jun 23, 202506:00 - Aug 1, 202516:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 02, 2025 - 09:00 AEST
Scheduled - WLT 2 & WLT 3 will be shut down between Monday 2nd June and Monday 28th July while carpet and chairs are being replaced. There will be increased construction activity coming in and out of the WLT while they remove waste into a bin in CP1 and bring in new materials.
Jun 2, 202509:00 - Jul 28, 202517:00 AEST
Identified - Air-conditioning services in HA6 have been interrupted due to unscheduled maintenance works. We aim to have these services back online as soon as possible.
Jan 21, 2025 - 16:33 AEDT
Scheduled maintenance testing of the fire and essential safety measures systems is taking place in the Library on Monday 7th July from 06:00am to 09:00am. Please note that heating and cooling to the building will be disrupted. Tones may sound during this time. Posted on
Jun 11, 2025 - 08:40 AEST
Scheduled maintenance testing of the fire and essential safety measures systems is taking place in the Library on Tuesday 8th July from 06:00am to 09:00am. Please note that heating and cooling to the building will be disrupted. Tones may sound during this time. Posted on
Jun 11, 2025 - 08:41 AEST
Scheduled maintenance testing of the fire and essential safety measures systems is taking place in the Library on Wednesday 9th July from 06:00am to 09:00am. Please note that heating and cooling to the building will be disrupted. Tones may sound during this time. Posted on
Jun 11, 2025 - 08:42 AEST
Scheduled maintenance testing of the fire and essential safety measures systems is taking place in the Library on Thursday 10th July from 06:00am to 09:00am. Please note that heating and cooling to the building will be disrupted. Tones may sound during this time. Posted on
Jun 26, 2025 - 13:58 AEST
Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in Arts and the Library Union Building on Monday 14th of July between 08:00am and 9:30am
What is System Interface Testing? In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.
Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems. Posted on
Jun 13, 2025 - 10:56 AEST
Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the Education Building on Monday 14th of July between 09:00am and 10:00am
What is System Interface Testing? In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.
Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems. Posted on
Jun 13, 2025 - 10:57 AEST
Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the Ironbark Centre on Monday 14th of July between 08:00am and 9:30am
What is System Interface Testing? In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.
Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems. Posted on
Jun 13, 2025 - 10:58 AEST
Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the Business and Technology Building on Monday 14th of July between 10:30am and 11:00am.
What is System Interface Testing? In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.
Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems. Posted on
Jun 13, 2025 - 11:01 AEST
Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the Visual Arts Building on Monday 14th of July between 12:00pm and 12:30pm.
What is System Interface Testing? In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.
Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems. Posted on
Jun 13, 2025 - 11:02 AEST
Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the Nancy Long Dining Hall on Monday 14th of July between 08:00am and 9:30am
What is System Interface Testing? In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.
Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems. Posted on
Jun 13, 2025 - 11:04 AEST
Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the Health 2 Building on Monday 14th of July between 1:30pm and 2:30pm.
What is System Interface Testing? In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.
Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems. Posted on
Jun 13, 2025 - 11:05 AEST
Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the Applied Sciences 1 and 2 Buildings on Monday 14th of July between 2:30pm and 3:30pm.
What is System Interface Testing? In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.
Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems. Posted on
Jun 13, 2025 - 11:06 AEST
Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the La Trobe Art Institute on Tuesday 15th of July between 08:00am and 9:30am
What is System Interface Testing? In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.
Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems. Posted on
Jun 13, 2025 - 11:35 AEST
Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the Arts and the Library Union Building on Tuesday 15th of July between 09:00am and 10:00am
What is System Interface Testing? In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.
Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems. Posted on
Jun 13, 2025 - 11:36 AEST
Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in the McKay Lecture Theatre on Tuesday 15th of July between 10:00am 10:30am
What is System Interface Testing? In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.
Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems. Posted on
Jun 13, 2025 - 11:45 AEST
Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in Hillside Apartments 1 - 6 on Tuesday 15th of July between 11:00am and 11:30am.
What is System Interface Testing? In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.
Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems. Posted on
Jun 13, 2025 - 11:50 AEST
Scheduled System Interface Testing of the fire and essential safety measures systems is taking place in The Units on Tuesday 15th of July between 11:30am to 12:00pm
What is System Interface Testing? In July, I&O will conduct System Interface (SIT) Testing across the Bundoora Campus. To complete this, I&O will need to simulate a building fire alarm in buildings across the campus. This testing will set off evacuation tones and interrupt the building HVAC system for the duration of the testing in each building. Testing usually takes 30 to 60 minutes to complete in each building.
Fire System Interface Testing (SIT) is an Australian Standard requirement under AS 1851 – Fire Protection Systems and will provide LTU information on how to address any issues regarding the performance of the building fire and mechanical protection systems. Posted on
Jun 13, 2025 - 11:52 AEST
Completed -
The scheduled maintenance has been completed.
Jul 1, 08:00 AEST
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jul 1, 06:00 AEST
Scheduled -
Scheduled maintenance testing of the fire and essential safety measures systems is taking place in David Myers East, Central and West on Tuesday 1st July between 06:00am and 08:00am. Heating and cooling to these buildings shall be disrupted and tones may sound during this time.
Jun 12, 09:15 AEST
Completed -
The scheduled maintenance has been completed.
Jun 30, 16:00 AEST
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 30, 07:30 AEST
Scheduled -
Continuation from works on Thursday 26th June. We will be carrying out repairs on all window awnings in the ARTS building on all levels. This will take place on Monday 30th June between 7:30am and 4:00pm. Works will take up to 1 hour per window.
Jun 27, 15:47 AEST
Completed -
The scheduled maintenance has been completed.
Jun 26, 16:00 AEST
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 26, 07:30 AEST
Scheduled -
We will be carrying out repairs on all windows in the ARTS building on all levels. This will take place on Thursday 26 June between 7:30am and 4:00pm. Works will take up to 1 hour per window.
Jun 25, 15:26 AEST
Completed -
The scheduled maintenance has been completed.
Jun 26, 15:00 AEST
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 23, 12:00 AEST
Scheduled -
The water supply to LIMS1 will be periodically isolated in specific locations from 12:00pm Monday 23rd June until Thursday 26th June at 3:30pm. Outage will only impact 1 toilet block or fixture at a time and will not last more than 20 minutes.
Jun 13, 13:46 AEST
Completed -
The scheduled maintenance has been completed.
Jun 26, 12:00 AEST
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 25, 06:00 AEST
Update -
We will be undergoing scheduled maintenance during this time.
Jun 19, 11:38 AEST
Scheduled -
Access at the end of Glenn Drive and to Glenn Kitchen, will be restricted from 6:00am Wednesday 25th to 12:00pm Thursday 26th June 2025 due to scheduled crane lift works.
Jun 19, 11:36 AEST
Completed -
The scheduled maintenance has been completed.
Jun 25, 15:30 AEST
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 23, 07:30 AEST
Update -
We will be undergoing scheduled maintenance during this time.
Jun 19, 08:54 AEST
Scheduled -
Buildings Education 1 & 2, Sylvia Walton, and Health Sciences 2 will be undergoing building fabric work. The estimated time of completion is Wednesday 25th June 2025 at 3:30pm. This project may generate some construction noise during this time.
Jun 19, 08:54 AEST
Completed -
The scheduled maintenance has been completed.
Jun 23, 16:30 AEST
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 23, 08:00 AEST
Update -
We will be undergoing scheduled maintenance during this time.
Jun 20, 13:13 AEST
Scheduled -
Scheduled maintenance testing of the fire and essential safety measures systems is taking place in the Bendigo Campus Sitewide on Monday 23rd June from 8:00am - 4:30pm. Tones may sound during this time.
Jun 20, 13:13 AEST
Completed -
The scheduled maintenance has been completed.
Jun 23, 15:00 AEST
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 19, 08:00 AEST
Scheduled -
The water supply to LIMS2 will be periodically isolated in specific locations from 08:00am Thursday 19th June until Monday 23rd June at 3:30pm. Outage will only impact 1 toilet block or fixture at a time and will not last more than 20 minutes.
Jun 13, 13:42 AEST
Completed -
The scheduled maintenance has been completed.
Jun 23, 08:01 AEST
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 23, 07:00 AEST
Update -
We will be undergoing scheduled maintenance during this time.
Jun 20, 11:47 AEST
Scheduled -
The power supply to building Education 2, Muslim Prayer room will be interrupted on Monday 23rd June 2025 from 7:00am - 8:00am to allow for scheduled maintenance works.
Jun 20, 11:47 AEST
Completed -
The scheduled maintenance has been completed.
Jun 20, 12:00 AEST
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 20, 09:00 AEST
Update -
We will be undergoing scheduled maintenance during this time.
Jun 17, 14:35 AEST
Scheduled -
The hot/cold water supply to the male pool shower in the Indoor Sports Centre will be interrupted on Friday 20th June 2025 from 9:00am - 12:00pm to allow for repair works.
Jun 17, 14:35 AEST
Completed -
The scheduled maintenance has been completed.
Jun 19, 12:00 AEST
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 17, 14:00 AEST
Update -
We will be undergoing scheduled maintenance during this time.
Jun 13, 13:27 AEST
Scheduled -
The water supply to R.L.Reid Building will be periodically isolated in specific locations on Tuesday 17 Jun 25 from 2:00pm - 12:00pm on Thursday 19 Jun 25 to allow for scheduled maintenance works.
Jun 13, 13:26 AEST
Completed -
The scheduled maintenance has been completed.
Jun 19, 08:01 AEST
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 19, 07:00 AEST
Update -
We will be undergoing scheduled maintenance during this time.
Jun 18, 12:18 AEST
Scheduled -
The power supply to Health Sciences 3 Level 5 will be interrupted on Thursday 19th June 2025 from 7:00am - 8:00am to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Jun 18, 12:18 AEST
Completed -
The scheduled maintenance has been completed.
Jun 19, 08:00 AEST
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 19, 06:30 AEST
Update -
We will be undergoing scheduled maintenance during this time.
Jun 18, 12:14 AEST
Scheduled -
The power supply to Health Sciences 1 Level 4 will be interrupted on Thursday 19th June 2025 from 6:30am - 8:00am to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Jun 18, 12:13 AEST
Completed -
The scheduled maintenance has been completed.
Jun 17, 17:00 AEST
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 17, 07:30 AEST
Scheduled -
The water supply to MCA-1 will be interrupted on Tuesday 17th June between 7:30am and 5:00pm to allow for scheduled maintenance works.
Jun 16, 14:09 AEST
Completed -
The scheduled maintenance has been completed.
Jun 17, 15:30 AEST
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 16, 12:00 AEST
Update -
We will be undergoing scheduled maintenance during this time.
Jun 13, 12:47 AEST
Update -
We will be undergoing scheduled maintenance during this time.
Jun 13, 12:33 AEST
Update -
We will be undergoing scheduled maintenance during this time.
Jun 13, 12:32 AEST
Scheduled -
The water supply to the Sports Park Pavilion will be periodically isolated in specific locations from 12:00pm Monday 16th June until 3:30pm Tuesday 17th June.
Jun 13, 12:31 AEST
Completed -
The scheduled maintenance has been completed.
Jun 17, 08:01 AEST
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 17, 07:00 AEST
Scheduled -
The power supply to HS3 level 5 will be interrupted on Tuesday 17th June between 7:00am and 8:00am to allow for installation of new RCD's in switchboards.
Jun 16, 08:22 AEST
Completed -
The scheduled maintenance has been completed.
Jun 17, 08:00 AEST
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 17, 06:30 AEST
Update -
We will be undergoing scheduled maintenance during this time.
Jun 16, 08:23 AEST
Scheduled -
The power supply to HS1 level 4 will be interrupted on Tuesday 17th June between 6:30am and 8:30am to allow for installation of new RCD's in switchboards.