In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 22, 08:03 AEDT
Scheduled - Infrastructure and Operations will be undertaking routine System Interface Testing of Applied Sciences 1, Applied Sciences 2, Engineering and Technology, McKay Lecture Theatre, Health Sciences 1, Health Sciences 2, The Units, Hillside Apartments, The Terraces, Robert Holmes Village, Orde House and View Street (La Trobe Art Institute). Testing will involve activating a smoke detector to generate an alarm on the building FIP to test the system operates as it should in a fire. There will be evacuation tones and the system will impact heating and cooling.
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 22, 07:00 AEDT
Scheduled - The power supply to Education 1, Education 2 & Humanities 2 will be interrupted from 07:00am to 4:00 pm Friday 22nd January to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 21, 10:30 AEDT
Scheduled - Agora Square is currently undergoing maintenance works. The estimated date of completion is Friday 22nd January 4:00 pm. This project will generate loud jackhammering construction noise during this time.
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 11, 07:30 AEDT
Scheduled - The power supply to David Myers Building- East will be interrupted between 07:30 am to 5:00 pm Monday 11th January 2021 to Friday 22nd January 2021 to allow for LED Lighting Upgrade works.
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 7, 07:00 AEDT
Update - We will be undergoing scheduled maintenance during this time.
Update - We will be undergoing scheduled maintenance during this time.
Update - We will be undergoing scheduled maintenance during this time.
Scheduled - Concrete remedial works are planned for the Level 2 external walkways of the East Lecture Theatres.. There will be loud grinding noise heard intermittently throughout the day. Saw cutting, hydraulic concrete breaker and a small excavator will be used, resulting in loud grinding and banging noise within the vicinity of East Lecture Theatres, Donald Whitehead Building, Humanities 3 and Agora East. The estimated date of completion is Friday 19th February 2021.
Investigating - Air-conditioning services on levels 2,3 & 4 in Thomas Cherry Building have been interrupted. The I&O team are working to identify the cause and implement a solution.
Dec 3, 16:34 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 14, 07:00 AEDT
Scheduled - Access to Library and Student Union will be restricted from 07:00 am to 4:30 pm Monday 14th December 2020 to Friday 19th February 2021 to allow for scheduled maintenance works. This project may generate loud construction noise and dust during this time.
Update - Works are to continue until 5:00 pm Thursday 19th November.
Nov 17, 16:31 AEDT
Investigating - Access to Car Park 1 will be restricted from 07:30 am to 12:30 pm Tuesday 17th November to allow for scheduled maintenance works in Central Drive garden near the P1 zebra crossing. The truck will be set up on Central Drive however clear access will remain.
Nov 17, 09:15 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 30, 07:01 AEDT
Scheduled - Access to Biological Sciences 1 - Level 1 will be restricted from 07:00 am to 5:00 pm Monday 30th November to Friday 26th February to allow for scheduled fit-out works, including demolition and removal of hazardous materials. This project will generate some construction noise during this time.
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 27, 07:00 AEDT
Scheduled - Infrastructure and Operations are currently undertaking a major upgrade of the campus water mains. The estimated date of completion is 31st April 2021. Various areas around campus will be utilised for materials to be stored, these areas will have temporary fencing erected. This project may generate some construction noise during this time.
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 26, 07:00 AEDT
Scheduled - Parking access in Car Park 6 will be restricted near the Southern end of the Latrobe Apartments from 07:00 am Thursday 26th November to 4:00 pm Friday 30th April 2021 to allow for a temporary site compound for contractors working on the water main upgrade
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 23, 07:00 AEDT
Scheduled - Access to Chisholm College- All Blocks / Buildings will be restricted from 07:00 am Monday 23rd November to 7:00 pm Friday 26th February to allow for scheduled amenities refurbishment works. This project may generate some construction noise during this time.
Investigating - The power supply to Peribolos West, level 2 will be interrupted from 2:00 pm to 3:00 pm Friday 20th November to allow for scheduled maintenance works.
Nov 20, 13:45 AEDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 14, 08:01 AEDT
Scheduled - Access to Car Park 2 will be unavailable from 08:00 am to 5:00 pm Wednesday 14th October 2020 to Friday 22nd January 2021 to allow for scheduled solar panel car port construction works. Alternative parking can be found on Sharon Street or in Car Park 4.
Investigating - Hot Water services in George Singer Building have been interrupted. The I&O team are working to identify the cause and implement a solution.
Aug 18, 10:57 AEST
Identified - Air-conditioning services in Agora West level 1 and 2 have been interrupted. The I&O team are working to identify the cause and implement a solution. A time frame for restoration of services will be published as soon as it is available.
Oct 24, 16:06 AEDT
The power supply to Sylvia Walton building and Humanities 3 will be interrupted from 07:00 am to 4:00 pm Monday 25th January to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Posted on
Jan 14, 09:46 AEDT
The power supply to Education and La Trobe Art Institute will be interrupted from 07:30 am to 10:30 am Monday 25th January to allow for RCD push button testing.
Posted on
Jan 19, 11:24 AEDT
Update -
Lifeskills Building and John Scott Meeting House have been rescheduled from Wednesday 10th February and will now be completed between 7:00 am and 4:00 pm Wednesday 27th January
The power supply to Lifeskills Building, John Scott Meeting House, Martin and Donald Whitehead Buildings will be interrupted from 07:00 am to 4:00 pm Wednesday 27th January to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 20, 14:14 AEDT
Scheduled -
The power supply to Martin and Donald Whitehead Building will be interrupted from 07:00 am to 4:00 pm Wednesday 27th January to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 14, 09:50 AEDT
The power supply to Applied Science 1 and Nancy Long Dining Hall will be interrupted from 07:30 am to 10:30 am Wednesday 27th January to allow for RCD push button testing.
Posted on
Jan 19, 11:28 AEDT
Update -
Mont Park Buildings D & E and Gatehouse have been rescheduled from Tuesday 23rd February and will now be completed between 7:00 am and 4:00 pm Thursday 28th January.
The power supply to Beth Gleeson, Physical Sciences 2 and South West Annexe, Mont Park Buildings D & E and Gatehouse Buildings will be interrupted from 07:00 am to 4:00 pm Thursday 28th January to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 20, 14:21 AEDT
Scheduled -
The power supply to Beth Gleeson, Physical Sciences 2 and South West Annexe Buildings will be interrupted from 07:00 am to 4:00 pm Thursday 28th January to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 14, 09:53 AEDT
The power supply to Applied Science 2 and Visual Arts will be interrupted from 07:30 am to 10:30 am Thursday 28th January to allow for RCD push button testing.
Posted on
Jan 19, 11:41 AEDT
The power supply to Childrens Centre will be interrupted from 06:00 am to 07:00 am Friday 29th January to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Posted on
Jan 20, 14:28 AEDT
The power supply to Physical Sciences 1 and Thomas Cherry Buildings will be interrupted from 07:00 am to 4:00 pm Friday 29th January to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Posted on
Jan 14, 09:56 AEDT
The power supply to Engineering and Technology Building and Business and Technology will be interrupted from 07:30 am to 10:30 am Friday 29th January to allow for RCD push button testing.
Posted on
Jan 19, 11:44 AEDT
Update -
Menzies College annexes and Chisholm College Tower 10 have been rescheduled from Monday 15th February and will now be completed between 7:00 am and 4:00 pm Monday 1st February.
The power supply to The Learning Commons, LaTrobe Institute For Molecular Science 2, Menzies College annexes and Chisholm College Tower 10 will be interrupted from 07:00 am to 4:00 pm Monday 1st February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 20, 14:37 AEDT
Scheduled -
The power supply to The Learning Commons and LaTrobe Institute For Molecular Science 2 will be interrupted from 07:00 am to 4:00 pm Monday 1st February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 14, 10:03 AEDT
The power supply to Arts and Orde House will be interrupted from 07:30 am to 10:30 am Monday 1st February to allow for RCD push button testing.
Posted on
Jan 19, 12:13 AEDT
The power supply to R.L.Reid Building and LaTrobe Institute For Molecular Science 1 will be interrupted from 07:00 am to 4:00 pm Tuesday 2nd February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Posted on
Jan 14, 10:05 AEDT
The power supply to The Units A and The Units B will be interrupted from 07:30 am to 10:30 am Tuesday 2nd February to allow for RCD push button testing.
Posted on
Jan 19, 12:15 AEDT
Update -
University Lodge- Building A, Mont Park Building B&C and Terrace 7 have been rescheduled from Friday 19th February and will now be completed between 7:00 am and 4:00 pm Wednesday 3rd February.
The power supply to Biological Sciences 1 & 2, University Lodge- Building A, Mont Park Building B&C and Terrace 7 will be interrupted from 07:00 am to 4:00 pm Wednesday 3rd February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 20, 14:50 AEDT
Scheduled -
The power supply to Biological Sciences 1 & 2 will be interrupted from 07:00 am to 4:00 pm Wednesday 3rd February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 14, 10:08 AEDT
The power supply to Computer Centre, Robert Holmes Village and Student Services Centre will be interrupted from 07:30 am to 10:30 am Wednesday 3rd February to allow for RCD push button testing.
Posted on
Jan 19, 12:19 AEDT
Update -
Agriculture Reserve, Zoology Reserve, Wildlife Sanctuary and Health Sciences Clinic have been rescheduled from Friday 5th February and will now be completed between 7:00 am and 4:00 pm Thursday 4th February.
The power supply to Animal House & Animal House Glass House, Agriculture Reserve, Zoology Reserve, Wildlife Sanctuary and Health Sciences Clinic will be interrupted from 07:00 am to 4:00 pm Thursday 4th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 20, 14:59 AEDT
Scheduled -
The power supply to Animal House & Animal House Glass House will be interrupted from 07:00 am to 4:00 pm Thursday 4th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 14, 10:10 AEDT
The power supply to Health 1, LaTrobe Rural Health School and Ironbark Centre will be interrupted from 07:30 am to 10:30 am Thursday 4th February to allow for RCD push button testing.
Posted on
Jan 19, 12:21 AEDT
The power supply to Terraces 9-14 will be interrupted from 07:00 am to 4:00 pm Friday 5th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Posted on
Jan 20, 15:09 AEDT
The power supply to Hillside Apartments 1 - Hillside Apartments 6 and The Terraces will be interrupted from 07:30 am to 10:30 am Friday 5th February to allow for RCD push button testing.
Posted on
Jan 19, 12:23 AEDT
Update -
The Library has been rescheduled from Friday 26th February and will now be completed between 7:00 am and 4:00 pm Monday 8th February.
The power supply to Indoor Sports Centre, Landscaping, Campus Services 2A, Campus Services 2, Campus Services 1 (I&O) Boiler House and Library will be interrupted from 07:00 am to 4:00 pm Monday 8th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 20, 15:13 AEDT
Scheduled -
The power supply to Indoor Sports Centre, Landscaping, Campus Services 2A, Campus Services 2, Campus Services 1 (I&O) and Boiler House will be interrupted from 07:00 am to 4:00 pm Monday 8th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 14, 10:35 AEDT
Update -
Terrace 3-6 (EPA) and EPA Vehicle Testing Station have been rescheduled from Monday 22nd February and will now be completed between 7:00 am and 4:00 pm Tuesday 9th February.
The power supply to Annexe 1- Institute for Advanced Study, Confucius Institute, La Trobe Apartments, La Trobe House, Centre for Research, Language Diversity and Graduate House - East, Terrace 3-6 (EPA) and EPA Vehicle Testing Station will be interrupted from 07:00 am to 4:00 pm Tuesday 9th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 20, 15:25 AEDT
Scheduled -
The power supply to Annexe 1- Institute for Advanced Study, Confucius Institute, La Trobe Apartments, La Trobe House, Centre for Research on Language Diversity and Graduate House - East will be interrupted from 07:00 am to 4:00 pm Tuesday 9th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 14, 10:41 AEDT
Update -
Works in Lifeskills Building and John Scott Meeting House have now been rescheduled to be completed on Wednesday 27th January.
The power supply to Union Building and Union Hall will be interrupted from 07:00 am to 4:00 pm Wednesday 10th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 20, 13:19 AEDT
Scheduled -
The power supply to Union Building, Lifeskills Building and John Scott Meeting House will be interrupted from 07:00 am to 4:00 pm Wednesday 10th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 14, 10:48 AEDT
The power supply to Glenn College will be interrupted from 07:00 am to 4:00 pm Thursday 11th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Posted on
Jan 14, 10:52 AEDT
The power supply to Menzies College will be interrupted from 07:00 am to 4:00 pm Friday 12th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Posted on
Jan 14, 10:54 AEDT
The power supply to Barnes Way and Waterdale Apartments will be interrupted from 07:00 am to 4:00 pm Wednesday 17th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Posted on
Jan 14, 11:25 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 22, 10:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 22, 08:03 AEDT
Scheduled -
The power supply to Library and Student Union will be interrupted from 08:00 am to 10:00 am Friday 22nd January to allow for RCD push button testing.
Jan 12, 11:19 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 22, 07:30 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 22, 06:00 AEDT
Scheduled -
The power supply to Agora Theatre will be interrupted from 06:00 am to 07:30 am to allow for scheduled maintenance works.
Jan 21, 15:10 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 21, 17:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 21, 09:00 AEDT
Scheduled -
Infrastructure and Operations will be undertaking routine System Interface Testing of Engineering, Arts, Library and Student Union, Ironbark Centre, Business and Technology, Administration Precinct, Oval Change Rooms, Computer Science, Student Services Centre, Graphic Design, Visual Arts and Nancy Long Dining Hall. Testing will involve activating a smoke detector to generate an alarm on the building FIP to test the system operates as it should in a fire. There will be evacuation tones and the system will impact heating and cooling.
Jan 12, 08:23 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 21, 16:30 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 21, 09:00 AEDT
Scheduled -
Contractors will be inspecting and testing cooktop and ovens throughout Shepparton Campus Building. Inspections will be taking place between 09:00 am to 4:00 pm Wednesday 20th January.
Jan 19, 14:39 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 21, 16:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 21, 07:00 AEDT
Scheduled -
The power supply to Health Sciences 3, West Lecture Theatres & George Singer Building will be interrupted from 07:00am to 4:00 pm Thursday 21st January to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 13, 12:15 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 21, 10:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 21, 08:00 AEDT
Scheduled -
The power supply to Library and Student Union will be interrupted from 08:00 am to 10:00 am Thursday 21st January to allow for RCD push button testing.
Jan 12, 11:17 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 21, 07:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 13, 10:00 AEDT
Scheduled -
Access to Education 2 room #106 will be restricted from 10:00 am Wednesday 13th January to 07:00am Thursday 21st January to allow for contractors to utilize the room due to the LED lightning replacement works.
Jan 13, 08:23 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 20, 17:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 15, 08:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 14, 08:35 AEDT
Update -
As part of the LTU Switchboard upgrade program, works will be taking place in HU-3 with the replacement of the following switchboards
Level 1 DB 1 East Level 2 DB 2 East Level 4 DB 4 East Level 1 DB 1 West Level 2 DB 2 West Level 3 DB4 West
Jan 14, 08:34 AEDT
Scheduled -
The power supply to Humanities 3 will be interrupted from 08:00 am to 5:00 pm Friday 15th January to Wednesday 20th January to allow for switchboard replacement works.
Jan 14, 08:34 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 20, 16:30 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 20, 08:00 AEDT
Scheduled -
The power supply to Humanities 2 will be interrupted from 08:00 am to 4:30 pm Wednesday 20th January to allow for scheduled maintenance works.
Jan 19, 14:32 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 20, 16:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 20, 07:00 AEDT
Scheduled -
The power supply to Health Sciences 1 & 2 will be interrupted from 07:00 am to 4:00 pm Wednesday 20th January to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 13, 12:12 AEDT
Completed -
Works to Terrace 3-6 (EPA) and EPA Vehicle Testing Station have now been rescheduled to be completed on Tuesday 9th February.
Jan 20, 15:21 AEDT
Scheduled -
The power supply to Terrace 3-6 (EPA) and EPA Vehicle Testing Station will be interrupted from 07:00 am to 4:00 pm Monday 22nd February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 14, 11:45 AEDT
Completed -
Works in the Library have now been rescheduled to be completed on Monday 8th February.
Jan 20, 15:16 AEDT
Scheduled -
The power supply to the Library will be interrupted from 07:00 am to 4:00 pm Friday 26th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 14, 11:51 AEDT
Completed -
The power supply to Terraces 9-14 have been rescheduled from Thursday 18th February and will now be completed between 7:00 am and 4:00 pm Friday 5th February
Jan 20, 15:07 AEDT
Scheduled -
The power supply to Terraces 9-14 will be interrupted from 07:00 am to 4:00 pm Thursday 18th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 14, 11:32 AEDT
Completed -
Works in Agriculture Reserve, Zoology Reserve, Wildlife Sanctuary and Health Sciences Clinic have now been rescheduled to be completed on Thursday 4th February.
Jan 20, 14:55 AEDT
Scheduled -
The power supply to Agriculture Reserve, Zoology Reserve, Wildlife Sanctuary and Health Sciences Clinic will be interrupted from 07:00 am to 4:00 pm Friday 5th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 14, 10:18 AEDT
Completed -
University Lodge- Building A, Mont Park Building B&C and Terrace 7 have been rescheduled from Friday 19th February and will now be completed between 7:00 am and 4:00 pm Wednesday 3rd February.
Jan 20, 14:45 AEDT
Scheduled -
The power supply to The University Lodge- Building A, Mont Park Building B&C and Terrace 7 will be interrupted from 07:00 am to 4:00 pm Friday 19th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 14, 11:39 AEDT
Completed -
Menzies College Annexes and Chisholm Tower 10 have been rescheduled from Monday 15th February and will now be completed between 7:00 am and 4:00 pm Monday 1st February.
Jan 20, 14:38 AEDT
Scheduled -
The power supply to Menzies College Annexes and Chisholm Tower 10 will be interrupted from 07:00 am to 4:00 pm Monday 15th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 14, 11:00 AEDT
Completed -
Works in Childrens Centre have now been rescheduled to be completed on Friday 29th January.
Jan 20, 14:26 AEDT
Scheduled -
The power supply to Childrens Centre will be interrupted from 06:00 am to 07:00 am Monday 15th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 14, 11:03 AEDT
Completed -
Mont Park Buildings D & E and Gatehouse have been rescheduled from Tuesday 23rd February and will now be completed between 7:00 am and 4:00 pm Thursday 28th January.
Jan 20, 14:23 AEDT
Scheduled -
The power supply to Mont Park Building D & E and Gatehouse will be interrupted from 07:00 am to 4:00 pm Tuesday 23rd February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 14, 11:48 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 20, 10:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 20, 08:00 AEDT
Scheduled -
The power supply to Library and Student Union will be interrupted from 08:00 am to 10:00 am Wednesday 20th January to allow for RCD push button testing.
Jan 12, 11:10 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 20, 09:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 20, 08:00 AEDT
Scheduled -
The power supply to Sports Park Pavilion will be interrupted from 08:00 am to 9:00 am Wednesday 20th January to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 18, 11:39 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 20, 07:30 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 20, 07:00 AEDT
Scheduled -
The power supply to Menzies College - Annexe 4 will be interrupted from 07:00 am to 07:30 am Wednesday 20th January to allow for redundant cables to be removed.
Jan 18, 14:01 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 19, 16:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 19, 07:01 AEDT
Update -
Please note; Sports Park Pavilion has been rescheduled to be completed on Wednesday 20th January.
Jan 18, 11:41 AEDT
Scheduled -
The power supply to Outer South Building 1, Sports Hub, Melbourne City Football Club, Outer South Building 4, Lower Playing Field Pavilion, Sports Park Pavilion & Hooper & Szental Lecture Theatres will be interrupted from 07:00am to 4:00 pm Tuesday 19th January to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 13, 11:47 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 19, 16:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 11, 08:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 8, 14:17 AEDT
Scheduled -
Air-conditioning services in Brian Grogan Building will be interrupted from 08:00 am Monday 11th January to 4:00 pm Tuesday 19th January to allow for installation of a new chiller.
Jan 8, 11:15 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 19, 10:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 19, 08:00 AEDT
Scheduled -
The power supply to Library and Student Union will be interrupted from 08:00 am to 10:00 am Tuesday 19th January to allow for RCD push button testing.
Jan 12, 11:09 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 18, 16:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 18, 07:00 AEDT
Scheduled -
The power supply to Peribolos East & West (DATA CENTRE will not be affected) will be interrupted from 07:00am to 4:00 pm Monday 18th January to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 13, 11:29 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 18, 10:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 18, 08:01 AEDT
Scheduled -
The power supply to Library and Student Union will be interrupted from 08:00 am to 10:00 am Monday 18th January to allow for RCD push button testing.
Jan 12, 11:04 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 18, 00:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 21, 00:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 16, 13:34 AEDT
Scheduled -
There will be a loss of air conditioning, heating and hotwater throughout the entire period from Monday 21st December 2020 through to Sunday 17th January 2021 thoughout Agora Theatre, Agora West, Agora East, Beth Gleeson Building, Biological Sciences 1, Biological Sciences 2, Donald Whitehead Building, Education 1, Education 2, East Lecture Theatres, Glenn College, Health Sciences 1, Health Sciences 2, Health Sciences 3, Humanities 2, Humanities 3, Indoor Sports Centre, Physical Sciences 1, Physical Sciences 2, R.L.Reid Building, Thomas Cherry Building, Union Building and West Lecture Theatres. The Annual Maintenance Shutdown is an essential part of the La Trobe University planned maintenance program.
Dec 15, 11:30 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 17, 23:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 21, 00:00 AEDT
Scheduled -
There will be a loss of airconditioning throughout the entire period from Monday 21st December 2020 through to Sunday 17th January 2021 thoughout Chisholm College- All Blocks / Buildings, Menzies College and Terrace 3-6 (EPA). The Annual Maintenance Shutdown is an essential part of the La Trobe University planned maintenance program.
Dec 16, 14:03 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 17, 23:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 21, 00:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 16, 14:01 AEDT
Scheduled -
There will be a loss of air conditioning and heating throughout Hooper & Szental Lecture Theatres, Martin Building and Social Sciences between Monday 21st December 2020 through to Sunday 17th January 2021. The Annual Maintenance Shutdown is an essential part of the La Trobe University planned maintenance program.
Dec 16, 13:59 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 17, 23:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 21, 00:00 AEDT
Scheduled -
There will be a loss of heating and hot water throughout Cycle Smart Centre North, Cycle Smart Centre South, George Singer Building, Library, LaTrobe Institute For Molecular Science 1, LaTrobe Institute For Molecular Science 2, Peribolos East, Sylvia Walton building and The Learning Commons between Monday 21st December 2020 through to Sunday 17th January 2021. The Annual Maintenance Shutdown is an essential part of the La Trobe University planned maintenance program.
Dec 16, 13:42 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 17, 18:30 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 15, 17:30 AEDT
Scheduled -
The power supply to Menzies College - Administration will be interrupted from 5:30 pm to 6:00 pm Friday 15th January to Sunday 17th January to allow for switchboard upgrades.
Jan 13, 10:34 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 15, 17:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 12, 12:00 AEDT
Scheduled -
The power supply to Chisholm College and Menzies College will be interrupted from 12:00 pm to 5:00 pm Tuesday 12th January to Friday 15th January to allow for switchboard upgrades.
Jan 12, 09:44 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 15, 17:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Oct 2, 07:00 AEST
Scheduled -
Approximately 70% of the spaces in Car Park 1 and Car Park 2 will be unavailable from Friday 2nd October 2020 until January 15th 2021 due to solar panel car ports being constructed. Alternative parking can be used in the eastern section of Car Park 1, on street or in the numerous other car parks around campus.
Sep 30, 10:52 AEST
Completed -
The scheduled maintenance has been completed.
Jan 15, 16:30 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 15, 07:31 AEDT
Scheduled -
Concrete remedial works are planned for the Level 2 external walkways of the East Lecture Theatres. There will be a concrete truck on site to complete the concrete slab pour to the level 2 walkways. There will be some loud noise heard from the truck. The estimated date of completion is Friday 15th January at 4:30 pm.
Dec 22, 10:26 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 15, 16:30 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 11, 07:30 AEDT
Scheduled -
The power supply to David Myers Building- Centre will be interrupted between 07:30 am to 5:00 pm Monday 11th January 2021 to Friday 15th January 2021 to allow for LED Lighting Upgrade works.
Dec 16, 13:14 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 15, 16:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 15, 07:00 AEDT
Scheduled -
The power supply to David Myers Building- East & West will be interrupted from 07:00am to 4:00 pm Friday 15th January to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 13, 11:25 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 15, 10:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 15, 07:00 AEDT
Scheduled -
The power supply to Health Sciences will be interrupted from 07:00 am to 10:00 am Friday 15th January to allow for connection of carport solar panel system.
Jan 13, 07:46 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 15, 10:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 15, 08:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 12, 11:03 AEDT
Scheduled -
The power supply to Ironbark Centre will be interrupted from 08:00 am to 10:00 am Friday 15th January to allow for RCD push button testing.
Jan 12, 11:00 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 15, 08:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 15, 07:00 AEDT
Scheduled -
The power supply to Health Sciences 1 (level 2 only) will be interrupted from 07:00 am to 8:00 am Friday 15th January to allow for switchboard installation.
Jan 12, 09:51 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 14, 16:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 14, 07:00 AEDT
Scheduled -
The power supply to Agora East, Agora West & Agora Theatre will be interrupted from 07:00am to 4:00 pm Thursday 14th January to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Jan 13, 11:03 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 14, 10:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 14, 09:00 AEDT
Scheduled -
The power supply to Mildura Residence 1 to Mildura Residence 4 will be interrupted from 09:00 am to 10:00 am Thursday 14th January to allow for RCD testing.
Jan 13, 10:55 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 14, 10:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 14, 08:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 13, 07:46 AEDT
Scheduled -
The power supply to Business and Technology will be interrupted from 08:00 am to 10:00 am Thursday 14th January to allow for RCD push button testing.
Jan 12, 10:58 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 14, 09:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 14, 08:00 AEDT
Scheduled -
The power supply to Deakin Avenue Campus will be interrupted from 08:00 am to 09:00 am Thursday 14th January to allow for RCD testing.
Jan 13, 10:50 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 14, 08:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 14, 07:00 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Jan 13, 10:49 AEDT
Scheduled -
The power supply to Brian Grogan Building will be interrupted from 07:00 am to 08:00 am Thursday 14th January to allow for RCD testing.
Jan 13, 10:47 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 14, 07:45 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 14, 06:45 AEDT
Scheduled -
The power supply to LaTrobe Institute For Molecular Science 2, level 1 labs will be interrupted from 06:45 am to 07:45 am Thursday 14th January to allow for to allow for scheduled maintenance works.
Jan 13, 16:48 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 12, 16:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 7, 08:00 AEDT
Scheduled -
The power supply to Glenn College will be interrupted from 08:00 am to 4:00 pm Thursday 7th January to Tuesday 12th January to allow for switchboard upgrades.
Jan 6, 10:11 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 11, 15:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 16, 14:00 AEDT
Scheduled -
Access to Moat Drive will be restricted from 2:00 pm to 3:30 pm Wednesday 16th December to Monday 11th January to allow for scheduled maintenance works. This project may generate some construction noise and dust during this time.
Dec 16, 13:27 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 9, 17:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 6, 07:30 AEDT
Update -
We will be undergoing scheduled maintenance during this time.
Dec 16, 12:36 AEDT
Scheduled -
The lighting supply to Childrens Centre will be interrupted between 07:30 am to 5:00 pm Wednesday 6th January 2021 to Saturday 9th January 2021 to allow for LED Lighting Upgrade works.
Dec 8, 11:37 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 8, 16:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 8, 09:46 AEDT
Scheduled -
Apologies for the inconvenience caused with the late notice, the original outage ended sooner then anticipated.
Jan 8, 09:46 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 8, 09:45 AEDT
Scheduled -
Power and lighting outages throughout Agriculture Reserve, Boiler House, Childrens Centre, Chisholm College- All Blocks / Buildings, Gatehouse, Campus Services 1 (I&O), Campus Services 2, Campus Services 2A, Landscaping, Donald Whitehead Building, Glenn College, Health Sciences Clinic, Indoor Sports Centre, John Scott Meeting House, Library, La Trobe Apartments North & South, LaTrobe Institute For Molecular Science 1, La Trobe University Medical Centre, La Trobe Sports Stadium, Wildlife Sanctuary, Menzies College, Sports Park Pavilion, Union Building, Lifeskills Building and Zoology Reserve. Works are limited to Wednesday 6th January to Friday 8th January 2021 (inclusive). Outages will occur between 8am-4pm, with the exception of LIMS1 where the shutdown will last between 8am-12pm.
Jan 8, 09:41 AEDT
Completed -
The scheduled maintenance has been completed.
Jan 8, 08:00 AEDT
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 8, 06:01 AEDT
Scheduled -
Infrastructure and Operations will be undertaking routine Fire Alarm Testing of Childrens Centre between 06:00 am to 08:00 am Friday 8th January. Tones will be generated during this period.
Jan 7, 09:10 AEDT