POWER OUTAGE / SAFETY SWITCH TESTING - LTSS [BUNDOORA]

Scheduled for Jan 30, 06:00 - 09:00 AEDT

Scheduled

The power supply to LTSS will be interrupted on FRIDAY 30 JANUARY BETWEEN 6:00AM AND 9:00AM to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Posted Jan 23, 2026 - 09:37 AEDT
This scheduled maintenance affects: Melbourne (Bundoora) Campus Buildings (LTSS | La Trobe Sports Stadium).