SYSTEM INTERFACE TESTING - AW1, AW-3, AW-4, AW-6, AW-8 [ALBURY WODONGA]
Scheduled Maintenance Report for LTU | Outages
Completed
The scheduled maintenance has been completed.
Posted Dec 06, 2021 - 17:00 AEDT
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Dec 06, 2021 - 12:00 AEDT
Update
 Administration Building – 12.00pm to 1.00pm
 David Mann Library – 1.00pm to 2.00pm
 Teaching Building (AW3) – 2.00pm to 3.00pm
 Health Sciences (AW6) – 3.00pm to 4.00pm
 Research Centre (AW8) – 4.00pm to 5.00pm
Posted Nov 30, 2021 - 13:47 AEDT
Scheduled
Infrastructure and Operations will be undertaking routine System Interface Testing of David Mann Library, Teaching Building, Michael J Osborne Building (Administration), Health Sciences and Nancy F Millis Building between 12:00 pm and 5:00 pm Monday 6th December. Testing will involve activating a smoke detector to generate an alarm on the building FIP to test the system operates as it should in a fire. There will be evacuation tones and the system will impact heating and cooling.
Posted Nov 30, 2021 - 13:47 AEDT
This scheduled maintenance affected: Albury Wodonga Campus Buildings (AW1 | David Mann Library, AW-3 | Teaching Building, AW-4 | Michael J Osborne Building (Administration), AW-6 | Health Sciences, AW-8 | Nancy F Millis Building (MDFRC)).