POWER OUTAGE / SAFETY SWITCH TESTING - LTWS [BUNDOORA]

Scheduled for Feb 10, 08:00 - 09:00 AEDT

Scheduled

The power supply to LTWS will be interrupted on TUESDAY 10 FEBRUARY from 08:00AM to 09:00AM to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Posted Feb 03, 2026 - 10:56 AEDT
This scheduled maintenance affects: Melbourne (Bundoora) Campus Buildings (LTWS | Wildlife Sanctuary).