POWER OUTAGE / SAFETY SWITCH TESTING - HHS1, HHS2, AS1, AS2, LSU [BENDIGO]

Scheduled for Jul 1, 06:00 - 12:30 AEST

Scheduled

The power supply to HHS1, HHS2, AS1, AS2, LSU (North side) will be interrupted on WEDNESDAY 1 JULY 2026 from 06:00AM to 3:30PM to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Posted Jun 22, 2026 - 09:45 AEST
This scheduled maintenance affects: Bendigo Campus Buildings (AS1 | Applied Science 1, AS2 | Applied Science 2, HHS1 | Health 1, HHS2 | LaTrobe Rural Health School (LRHS), LSU | Library and Student Union).