POWER OUTAGE / SAFETY SWITCH TESTING - AW8, FS [ALBURY-WODONGA]

Scheduled for Dec 17, 08:00 - 12:00 AEDT

Scheduled

The power supply to the Nancy F Millis Building and Teaching Buildings, Field Stores and Recycling Shed will be interrupted on Wednesday 17th December between 08:00am and 12:00pm to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Posted Dec 03, 2025 - 09:53 AEDT
This scheduled maintenance affects: Albury Wodonga Campus Buildings (AW-8 | Nancy F Millis Building (MDFRC), FS | Field Store).