POWER OUTAGE - TER 9-14 [BUNDOORA]
Scheduled Maintenance Report for LTU | Outages
Completed
The scheduled maintenance has been completed.
Posted Feb 05, 2021 - 16:00 AEDT
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Feb 05, 2021 - 07:00 AEDT
Scheduled
The power supply to Terraces 9-14 will be interrupted from 07:00 am to 4:00 pm Friday 5th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Posted Jan 20, 2021 - 15:09 AEDT
This scheduled maintenance affected: Melbourne (Bundoora) Campus Buildings (TER 9 | Terrace 9, TER 10 | Terrace 10, TER 11 | Terrace 11, TER 12 | Terrace 12, TER 13 | Terrace 13, TER 14 | Terrace 14).