Scheduled

The power supply to Beth Gleeson and Sylvia Walton will be interrupted on Monday 2 Feb 2026 from 7:00am to 3:00pm to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Posted Jan 27, 2026 - 13:20 AEDT
This scheduled maintenance affected: Melbourne (Bundoora) Campus Buildings (BG | Beth Gleeson Building, SW | Sylvia Walton building).