POWER OUTAGE / SAFETY SWITCH TESTING - LSU, ORDE [BENDIGO]

Scheduled for Jun 29, 06:00 - 12:30 AEST

Scheduled

The power supply to LSU (South side), ORDE will be interrupted on MONDAY 29 JUNE 2026 from 06:00AM to 3:30PM to allow for Residual Current Device (RCD) / safety switch testing. These works will incur a minor power outage for up to 10 seconds on each circuit tested.
Posted Jun 22, 2026 - 09:23 AEST
This scheduled maintenance affects: Bendigo Campus Buildings (LSU | Library and Student Union, ORDE | Orde House).