POWER OUTAGE - HS3 WLT GS [BUNDOORA]
Scheduled Maintenance Report for LTU | Outages
Completed
The scheduled maintenance has been completed.
Posted Jan 21, 2021 - 16:00 AEDT
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Jan 21, 2021 - 07:00 AEDT
Scheduled
The power supply to Health Sciences 3, West Lecture Theatres & George Singer Building will be interrupted from 07:00am to 4:00 pm Thursday 21st January to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Posted Jan 13, 2021 - 12:15 AEDT
This scheduled maintenance affected: Melbourne (Bundoora) Campus Buildings (GS | George Singer Building, HS3 | Health Sciences 3, WLT | West Lecture Theatres).