ANNUAL SHUTDOWN HEATING AND HOT WATER OUTAGE - CSCN, CSCS, GS, L, LIMS1, LIMS, PE, SW, TLC - [BUNDOORA]
Scheduled Maintenance Report for LTU | Outages
Completed
The scheduled maintenance has been completed.
Posted Jan 17, 2021 - 23:00 AEDT
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Dec 21, 2020 - 00:00 AEDT
Scheduled
There will be a loss of heating and hot water throughout Cycle Smart Centre North, Cycle Smart Centre South, George Singer Building, Library, LaTrobe Institute For Molecular Science 1, LaTrobe Institute For Molecular Science 2, Peribolos East, Sylvia Walton building and The Learning Commons between Monday 21st December 2020 through to Sunday 17th January 2021.
The Annual Maintenance Shutdown is an essential part of the La Trobe University planned maintenance program.
Posted Dec 16, 2020 - 13:42 AEDT
This scheduled maintenance affected: Melbourne (Bundoora) Campus Buildings (CSCN | Cycle Smart Centre North, CSCS | Cycle Smart Centre South, GS | George Singer Building, L | Library, LIMS1 | LaTrobe Institute For Molecular Science 1, LIMS2 | LaTrobe Institute For Molecular Science 2, PE | Peribolos East, SW | Sylvia Walton building, TLC | The Learning Commons).