POWER OUTAGE - NR1 NR2 NR3 NR4 NR6 NR7 TER 3-6 TER 15 [BUNDOORA]
Scheduled Maintenance Report for LTU | Outages
Completed
The scheduled maintenance has been completed.
Posted Feb 09, 2021 - 16:00 AEDT
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Feb 09, 2021 - 07:00 AEDT
Update
Terrace 3-6 (EPA) and EPA Vehicle Testing Station have been rescheduled from Monday 22nd February and will now be completed between 7:00 am and 4:00 pm Tuesday 9th February.

The power supply to Annexe 1- Institute for Advanced Study, Confucius Institute, La Trobe Apartments, La Trobe House, Centre for Research, Language Diversity and Graduate House - East, Terrace 3-6 (EPA) and EPA Vehicle Testing Station will be interrupted from 07:00 am to 4:00 pm Tuesday 9th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Posted Jan 20, 2021 - 15:25 AEDT
Scheduled
The power supply to Annexe 1- Institute for Advanced Study, Confucius Institute, La Trobe Apartments, La Trobe House, Centre for Research on Language Diversity and Graduate House - East will be interrupted from 07:00 am to 4:00 pm Tuesday 9th February to allow for annual RCD Push Button Testing. These works will incur a minor power outage for up to 10 seconds on each circuit that’s being tested. Power will be restored once each circuit has been tested (10 second outage).
Posted Jan 14, 2021 - 10:41 AEDT
This scheduled maintenance affected: Melbourne (Bundoora) Campus Buildings (NR1 | Annexe 1- Institute for Advanced Study, NR2 | Confucius Institute, NR3 | La Trobe Apartments, NR4 | La Trobe House, NR6 | Centre for Research on Language Diversity, NR7 | Graduate House - East, TER 3-6 | Terrace 3-6 (EPA), TER 15 | EPA Vehicle Testing Station).