SYSTEM INTERFACE TESTING - AS1, AS2, ET, HA1-6, HHS2, HHS2, MLT, ORDE, R1A-B, R2, R3, VAC [BENDIGO]
Scheduled Maintenance Report for LTU | Outages
Completed
The scheduled maintenance has been completed.
Posted Jan 22, 2021 - 17:00 AEDT
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Jan 22, 2021 - 08:03 AEDT
Scheduled
Infrastructure and Operations will be undertaking routine System Interface Testing of Applied Sciences 1, Applied Sciences 2, Engineering and Technology, McKay Lecture Theatre, Health Sciences 1, Health Sciences 2, The Units, Hillside Apartments, The Terraces, Robert Holmes Village, Orde House and View Street (La Trobe Art Institute). Testing will involve activating a smoke detector to generate an alarm on the building FIP to test the system operates as it should in a fire. There will be evacuation tones and the system will impact heating and cooling.
Posted Jan 12, 2021 - 08:47 AEDT
This scheduled maintenance affected: Bendigo Campus Buildings (AS1 | Applied Science 1, AS2 | Applied Science 2, ET | Engineering and Technology Building, HA1 | Hillside Apartments 1, HA2 | Hillside Apartments 2, HA3 | Hillside Apartments 3, HA4 | Hillside Apartments 4, HA5 | Hillside Apartments 5, HA6 | Hillside Apartments 6, HHS1 | Health 1, HHS2 | LaTrobe Rural Health School (LRHS), MLT | Mckay Lecture Theatre, ORDE | Orde House, R1-A | The Units A, R1-B | The Units B, R2 | The Terraces, R3 - Robert Holmes Village, VAC | La Trobe Art Institute).